My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/23/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 09/23/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:54:18 PM
Creation date
9/22/2003 7:34:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/23/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Summary of City Engineer Plan Review <br />Ramsey Town Center <br />Plans Dated 27 August, 2003 ~ <br />Page 9 of 9 <br />Page Location <br />L2.0 <br /> <br />L 3.0,3.1, <br />4.0-4.4 <br /> <br />Comments <br />Show trail along north side of Civic Center Drive <br />Show at grade trail-street crossing connections between <br />Ramsey Parkway and Zeolite. Connection shall be made to <br />sidewalk adjacent to parkway. This also applies to the <br />Rhinestone intersection. <br />Certain trees are called out to be preserved during mass <br />grading operations. These trees are not reflected in the <br />landscaping plans. Trees that are preserved then disappear <br />during development can change public perception of a <br />project. <br /> <br />Utility Plans <br />Page <br /> <br />149-150 <br /> <br />Loc~ion <br /> <br />Comments <br />Move trunk sanitary sewer to first street east of Zeolite to <br />eliminate conflict with ~runk storm sewer and regional trail <br />underpass. <br />Provide combined water equalization/trail underpass at <br />Zeolite street between West Ramsey parkway North and <br />South. The level of the trail should be above the 10 year <br />normal water level of the pond. See comments on grading <br />and plat sheets regarding this issue. <br />Provide combined water equalization/trail underpass at <br />Rtfinestone Street between East Ramsey Parkway North <br />and South. See comments for Zeolite Street. <br />Show existing well and associated facilities <br />Label raw water lines <br /> <br />Last printed September 15, 2003 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.