Laserfiche WebLink
Sheet 86 <br /> <br />Sheet 87 <br /> <br />o <br /> <br />Sheet 88 <br /> <br /> 2. <br /> <br />Sheet 89 <br /> <br />Sheet 93 <br /> <br />Sheet 94 <br /> <br />Sheet 99 <br /> <br />Sheet 105 <br /> <br />Storm sewer may need to be added at the intersection of East Town Center Drive and East <br />Ramsey Pkwy (south). The water won't flow from the north gutter line to the south gutter <br />line and eventually to CB607A. <br /> <br />Pipe from CBMH 50 to CBMH 51 is shown as a 36" on the plans, but is modeled and shown <br />in the pipe sizing worksheet as a 21". <br /> <br />Pipe from CBMH 51 to CBMH 52 is shown as a 42" on the plm~s, but is modeled and shown <br />on the pipe sizing worksheet as a 27". <br /> <br />Pipe from MH 20 to CBMH 52 is shown as a 30" on the plans, but is modeled and shown on <br />the pii~e sizing Worksheet as a 42". Also, the upstream pipe is a 42". <br /> <br />The plan view does not match the profile between CB5 and CBMH 17. <br />CBMH 55 in the plan view should be CBMH 18. <br /> <br />CB 2 in the plan view should be CB 3. <br /> <br />Pipes from MH 802 to MH 802A are shown as 33" on the plans, but are modeled and shown <br />on the pipe sizing worksheet as 36". <br /> <br />Intersection of Zeolite and Civic Center Drive will have to be detailed to make sure the CB's <br />are in the correct place. <br /> <br />Pipe from CBMH 717 to FES 900 was modeled as a 96" arch. <br /> <br />Pipes from CBMt-I 509B to MH 500, there is a ? 1" pipe upstream of a ~ .~ p~pe. <br /> <br />G:\M unicipa[~Aramsey\951 \ra951 REVIEW.doc <br /> <br />Page 9 <br /> <br />----~ Hakanson <br /> Anderson <br /> Assoc., Inc. <br /> <br /> <br />