Laserfiche WebLink
Several iterations of the'abov'e scenarios were prepared, with resu[~ discussed by all <br />concer~-.~ .q~_: ev.~lu.~*;~,~ ~?.rmin~d that ~.-. comm~'.t.~d ro~dw-"y ns.~:.,erk <br />func~on acceptably in Year 2005 ~ven the following: <br /> <br />'f'ne assumed level of development, as recorded in the auached <br /> <br /> Traffic Analysis Zone tables, (Tables 1 - 4) and <br /> Implementation of the committed roadway netWork, described in <br /> the attached list of roadway improvements. (Tables 5 - 7),. - <br /> <br /> -' The study just completed addressed growth resulting from the proposed MUSA' <br /> .- -- expansions in Andover and P. smsey, The study.also assumed"normal (without MUSA <br /> expansion) growth in An'dover and Ramsey and the other Anoka County communities, <br /> through the inputs used to construct the regional model: Thus, all future growth Md <br /> roadway capacity is not, and of course, c~nnot be "allocated" to the two cities. <br /> <br /> Assuming development occurs within the TAZs as forecasted, and ail transportation <br /> improvements are made, the tr,n~portafion demand will be in balance with <br />........ ::'":" ...... 'transportation capacity. The approval of an individual commvni ,tls M-USA.will be <br />...:,~.~:..... :.~ established through the Metropolitan.Council ?roc~ss. The County is confident <br /> <br /> · The MetroEolitan Council will expect that any MUSA expansion that exceeds these <br /> forecasts will require additional facilities or prograzns to accommodate the added <br /> demand, or that demand will be modified to allow the metropolitan highway system to <br /> function adequately. [f the committed roadway improvements are not implemented, <br /> traffic resulting from that growth is ~mlikely to be accommodated in 2015 at an <br /> · - acceptable level of service. However, as this may very well be the case in much of the <br /> reg-ion as well as in Anoka County, the County does not expect to be. able to resolve this <br /> problem alone. State,· re~onal and local cooperation will be essential, both'in system <br /> planning and in funding commitments. <br /> <br /> Anoka County expects to address these issu~ between now and 2005, takSng advantage <br /> of that time to evaluate system planning and funding options. Within Anoka County, <br /> we anticipate evaluating enhancements including ramp metering on TH 10, improved <br /> transit and park-and-ride facilities, land use options to increase local employment and <br /> reduce vekicle miles of travel (VlvlW), and others. We will be tookSng to the <br /> ........... , ....... -,,oft 'n the near ...... <br /> <br /> .... In' summary, we are pleased to be able to support the city's request. The attached <br /> technical memorandum documents the studfs methodology and fundings. <br /> <br /> <br />