My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/10/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 06/10/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:16:55 PM
Creation date
9/22/2003 9:28:40 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/10/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§ 8.30 <br /> <br />Table ITt <br /> <br />Percolation' rate of Percolati0'n'~ate df Allowa'ble <br />original soil under per square foot absorption area <br />sand layer, gallons/day loading rate square <br />minutes feet per gallons per <br /> ,,, day <br />6 to 15 0.79 1.27 <br /> 16 to 30 0.60 1.67 <br /> 31 to 45 0.50 2.00 <br /> 46 to'60 0.45 " 2.26 <br /> 61 to 120 0.24 4.20 <br /> <br />4. Below the sand layer, there shall be at least one layer of soil, <br /> either natural or fill, at least 12 inches thick, which has a <br /> percolation rate slower than 5 minutes-per inch (loamy <br /> sand). <br /> <br />5. Wherever possible, mounds shall be located on flat areas or <br /> crest of slopes. Mounds shall not be located on natural slopes <br /> of more than 3% if the percolation rate is slower than 60 <br /> m~nutes per inch to a depth of at least 24 inches below the <br /> sand layer. <br /> <br />6. Mounds shall not be located on slopes exceeding 6.% if the <br /> soil percolation rate is slower than 30 minutes per inch to a <br /> depth of at least 24 inches below the sand layer. <br /> <br />7. Mounds shall not be located on natural slopes exceeding i2% <br /> under any soil percolation rate conditions. <br /> <br />8. The bottom area of the filter material shall be sized on the <br /> basis of 200 square feet per bedroom or 0.83 square feet per <br /> gallon of waste per day. <br /> <br />9. In no case shall the width' of the filter material in a single <br /> bed exceed 10 feet. <br /> <br /> A rubber tired tractor may be used for plowing or disking, <br /> but in no case shall a rubber tired tractor be used after the <br /> surface preparation is completed. A crawler or track-type <br /> tractor shall be used for mound construction where the soil <br /> percolation rate is slower than 15 minutes per inch. <br /> <br />11. The discharge pipe from the pump to the mound area shall <br /> be installed, prior to soil surface preparation. The trench <br /> shall be carefully backfilled and compacted to prevent <br /> seepage of effluent. <br /> <br />12. Soft Surface Preparation. <br /> a) <br /> <br />All vegetation in excess of 4 inches in length and dead <br />organic debris must be removed from the surface of the <br /> <br />I <br />.I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> <br />Page 256 <br /> <br />Printed 12/28/90 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.