Laserfiche WebLink
Page 2 <br />June 19, 1997 <br />Mr. Steve Jankowski <br /> <br />Construction Staking and Construction Observation <br />Preparation of As-Built, Record Drawing <br />Soil Borings <br />Wetland Delineation <br /> <br />$13,710 <br />790 <br />2,200 <br />985 <br /> <br />In addition to these requested Technical Services items, you will also want to include an <br />allowance for materials and performance testing during construction of $1,500. The estimated <br />amount for soil borings includes the survey necessary to locate the borings, and the wetland <br />delineation includes the time to survey the delineated boundary. A copy of your request for <br />proposal containing the scope of services for the basic and technical services is attached for <br />your reference. In addition, I have attached a copy of our 1997 Hourly Rates that are <br />applicable to the technical services or any additional services requested. The hourly rates are <br />subject to revision if this contract extends beyond 1997. If you have any questions on the <br />scope of our services or the proposed fees, please let me know. We appreciate the <br />opportunity to work with you again on this project. <br /> <br />Sincerely, <br /> <br /> JOHN OLIVER & ASSOCIATES, INC. <br /> <br /> Vice Preside~ <br />~/Froject Manag;~n' PE JCB/prj <br /> <br />Enclosure <br /> <br /> <br />