My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/12/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 08/12/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:18:59 PM
Creation date
9/22/2003 10:34:29 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/12/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d) <br />d) <br /> <br />Draft Planning Commission meeting minutes dated August 5, 1997 <br />Proposed development permit <br /> <br />The facility is proposed to be 3,838 square feet in size. <br />requirements for lot coverage, setbacks, number and <br />landscaping, and screened waste enclosure. <br /> <br />The proposed project meets City Code <br />design of off-street parking spaces, <br /> <br />The exterior wails are proposed to consist of a combination of brick and some masonite siding. <br />City Code requires exterior walls to be 100% natural or prefabricated brick or stone unless <br />otherwise approved by City Council. The Planning Commission reviewed the site plan on <br />August 5 and recommended that the entirety of the exterior walls meet the requirements of City <br />Code. <br /> <br />The City has received a Grading Plan prepared by John Oliver and Associates dated August 1, <br />1997. The plan proposes draining the site from west to east into two detention ponds located on <br />the eastern border of the site. These ponds would overflow into the existing ditch system <br />draining the State and County highways. The volume of the ponding system would have the <br />capacity to hold a 25 year storm event without discharge to the ditch system. The City Engineer <br />is requesting drainage calculations to confirm the capacity of the detention ponds. <br /> <br />Recommendation: <br /> <br />The Planning Commission and City Staff recommend site plan approval contingent upon <br />compliance with the City Staff review letter dated August 1, 1997 and the recommendations of <br />the Planning Commission on August 5, 1997. <br /> <br />Council Action: <br /> <br /> Motion to: <br />Approve/deny the revised site plan proposal for the Burger King facility contingent upon <br />compliance with the City Staff review letter dated August 1, 1997, t_he recommendations <br />of the Planning Commission on August 5, 1997, and resolution of the access issues with <br />Anoka County and Mn/DOT. <br /> <br />Review Checklist: <br /> <br />CC: 08/12/97 <br /> <br />City Administrator <br />City Engineer <br />City Attorney <br /> <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.