My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/09/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 09/09/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:21:06 PM
Creation date
9/22/2003 12:13:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/09/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steven Jankowski, P.E. <br /> <br />- 3 - April 11, 1997 <br /> <br />I <br />I <br /> <br />- Staging and traffic control plans <br />- Construction details, soils notes and standard plates <br />- Erosion control plans <br />- Typical sections for all roadways <br />- Alignment data, including all coordinates, ties and azimuths <br />- Existing topography, utilities, and drainage features <br />- Proposed roadway curblines, tapers, radii, islands, bicycle trails, etc. <br />- Roadway profiles, groundlines, subcuts, superelevation and bench marks <br />- Storm sewer, culverts, and subsurface drainage plans and profiles <br />- Utility plans, including all sanitary sewer and water main work <br />- Turf establishment plans, including temporary erosion control <br />- Landscape plans <br />- Cross-section sheets <br />- Signal system plans <br />- Permanent signing and striping plan sheets <br /> <br />Submit plan to the City, County and Mn/DOT and make revisions as necessary for <br />approval. <br /> <br />Engineer's Estimate <br /> <br />80 hours <br /> <br /> I <br /> I <br /> I <br />I <br /> I <br /> I <br />I <br /> <br />· Determine contract pay items and compute and check all contract quantities. Break out all <br /> quantities for cost splits and cost participation, as needed. <br /> <br />· Prepare Engineer's Estimate of Construction Costs <br /> <br />Contract Documents and Specifications 40 hours <br /> <br />I <br />I <br /> <br />· Develop contract special provisions as necessary. <br /> <br />· Develop Bid Documents. <br /> <br />· Assemble Contract Documents with special provisions and submit to the City and Mn/DOT <br /> for approval. <br /> <br />Permits <br /> <br />30 hours <br />20 hours <br /> <br />· Prepare permit applications for City signature <br /> - Minnesota Pollution Control Agency - NPDES <br /> - Watershed District <br /> - Anoka County Highway Department <br /> - U.S. Corps of Engineers Section 404 <br /> - Minnesota Department of Natural Resources <br />· Wetland Conservation Act <br /> <br />5. Right-of-Way and Easements <br /> <br />! <br />I <br />I <br />I <br />I <br />I <br /> <br />· Prepare legal descriptions and drawings as required to obtain ail necessary permanent <br /> right-of-way and easements <br /> <br />Total Phase II <br /> <br />1,500 hours <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.