My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/09/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 09/09/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:21:06 PM
Creation date
9/22/2003 12:13:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/09/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan Review: CMC/Wolf <br />Page 3 of 3 <br />August 27, 1997 <br /> <br />Architectural Standards: The one-story building does not exceed the 35-foot height limit. The <br />exterior walls are proposed to consist of a combination of common, single score, burnished and <br />rock face block, which is in accordance with City Code and the Business Park 95 covenants. <br /> <br />Lighting Plan: The site plan identifies exterior lighting fixtures and the detailed specifications <br />have been reviewed and approved by the City Engineer. <br /> <br />Mechanical Equipment: It is noted that the Business Park 95 covenants requires that <br />mechanical equipment located on a roof top may be painted to be compatible with the building if <br />expressly allowed by the Architectural Review Board. Any mechanical equipment placed <br />elsewhere on this site must be screened so as not to be visible from the public street and the <br />screening shall be aesthetically incorporated into the design of the building and constructed of <br />materials compatible with those of the building. <br /> <br />The Ramsey Planning Commission will be meeting to review the proposed site plan on Tuesday, <br />September 2, 1997, at 6:30 p.m. It is suggested that you or your representative be present at the <br />meeting to answer any questions tha? may arise. Staff will also be scheduling a meeting of the <br />Business Park 95 Architectural Review Board to review the site plan for conformance with the <br />covenants. You will be notified of the date and time as soon as it is set. <br /> <br />Enclosed for your information is a copy of the case cover sheet. If you have any questions, <br />please don't hesitate to call us at 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Zoning Administrator <br /> <br />Steve Jankowski <br />City Engineer <br /> <br />cc: Lampert Ai-chitects <br /> <br />I' <br />I <br />I <br /> <br />i <br />I <br /> <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.