My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/23/1997
Ramsey
>
Public
>
Agendas
>
Council
>
1997
>
Agenda - Council - 09/23/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 4:21:43 PM
Creation date
9/22/2003 12:24:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/23/1997
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page <br /> <br />United Power Association and Northern St'ares <br />Power transmission lines cross on northeast <br />corner of work area. <br /> <br />AUG 1 1997 <br /> <br />(13) <br /> <br />Natural Gas pipeline in ditch along 181st Ave. <br />over 1/4 mile from excavation. <br /> <br />All equipment used in excavation to be stored in <br />40' x I00' building in off season. <br /> <br />All equipment is modern and well maintained. The <br />large pieces will be a D5 dozer with 12'push blade <br />and 2 Unit draglines, one with a 50'boom, the other <br />with a 45' boom. <br /> <br />10. Enclosed is a drainage plan showing elevations from <br /> 181st Ave. to the south border. The entire body <br /> surrounding the work area is higher elevation. <br /> The land gently rolls and drains toward the proposed <br /> pond area. <br /> <br />11. All trucks will be using the designated hauling road <br /> through the middle of the farm. This area has been <br /> an old lane and private road for years. The end of <br /> this road is on top of a hill on 181st Ave, affording <br /> good visibility for trucks entering or leaving <br /> property. Also at the end of the road is the <br /> junction of Burns Township road, Rabbit Street. Most <br /> trucks hauling will be using Cty 64 going west. <br /> <br />12. The sale of this topsoil will not be open to public. <br /> Several contractors have contracted for ail-dirt <br /> removal. The hours of dirt removal bY contractors <br /> will be from 7 A.M.-5 P.M. Monday - Friday, Sat 7-3. <br /> <br />13. All dirt being excavated will be deposited in <br /> rows not exceeding 25' in height. This dirt <br /> will be dozed into a pile where it will be <br /> loaded into trucks and hauled away on the <br /> designated road <br /> <br />14. The pond excavation will .start in the fall of '97. <br /> The first year wilI'be spent primarily preparing <br /> the site for dirt removal with approx. 2 acres dug. <br /> In the ne)it two years, the project will speed up and <br /> hopefully we can dig four acres per year. Each acre <br /> of dirt will yield about 9,500 yards of 'm~'terial. The <br /> average depth of the pond will be around 6' with a <br /> gradual pitch from the shore. The estimated size of <br /> pond will be around twelve acres. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.