Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />15. <br /> <br />16. <br /> <br /> page 3 ~UG 1 ~ 1997 <br /> [BY:___~. . <br />Sequence of Pond Excavation: <br /> (see attached diagram) <br /> <br />Doze path on north side of the ditch and install <br />the silt fence.. Push debris east onto high <br />ground. <br /> <br />Dose clearing on west perimeter and install silt <br />fence. Push excess debris north to high ground. <br /> <br />Clear 100' wide strip on west side in Row I area. <br />Pile brush and debris in piles on north side of <br />pond area on high ground. <br /> <br />Start dirt excavation on northwest corner and <br />proceed to southwest corner by use of dragline. <br />Deposit dirt in north and south row to maximum <br />of 25' in height. <br /> <br />Em <br /> <br />Push dirt from row into pile-on north end and load <br />onto trucks. <br /> <br />Proceed on clearing area in Row 2 and continue to <br />dragiine dig pond. <br /> <br />G. Continue same in Row 3-6 clearing and digging. <br /> <br />Hm <br /> <br />Throughout excavation, doze brush and debris piles <br />to stimulate mulching of brush. <br /> <br />I feel that doing the work myself is an asset as I <br />will. ~not have to .rely on independent contractors to <br />help maintain a neat work environment or leave an <br />eyesore at completion of project. To complete the <br />project I plan on establishing new grass and planting <br />new trees from existing tree plots, leaving the pond <br />in natural foliage. Wildlife habitat will be planted <br />and landscaped to water edge. ~ <br /> <br /> <br />