Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />i <br />I <br />I <br />I <br /> <br />§ 8.30 <br /> <br /> Filter material for a soil treatment unit using gravity <br /> distribution of effluent shaIl not be placed in contact with <br /> original soils having a percolation rate faster than 0.1 <br /> m~nute per inch. <br /> <br /> For coarse softs having a percolation rate faster than 0.1 <br /> minute per inch, at least 12 inches of lo2my sand textured <br /> soft having a percolation rate between 6 and 15 m~nutes per <br /> inch at the original site shell be placed between the filter <br /> material and the coarse soft along the excavation bottom and <br /> sidewalls. The size of the soft treatment system must be <br /> based on the required treatment area for a soft having a <br /> percolation rate of 16 to 30 rn~nutes per inch as specified in <br /> Table II. <br /> <br /> For softs with percolation rates between 0.1 and 5 minutes <br /> per inch, at least one of the foZlowing treatment techrHques <br /> shall be used: <br />a) Distribute the sewage tank effluent by pressure flow over <br /> the treatment area as specided in this chapter. <br />b) D~vide the total soil treatment area into at least four <br /> equal parts connected serialIy;,.or <br />c) Provide at least 12 inches of loamy sand textured soil <br /> with a percolation rate between 6 and 15 m~uutes per <br /> inch in situ between the drainfield rock and the coarse <br /> - soils. Trenches must be used with this liner system. <br /> The size of the soft treatment system must be based on <br /> the required treatment area for a soil having a <br /> percolation rate bet~veen 16 to 30 m~uutes per inch as <br /> specified in Table II. <br /> <br />Mou~ds may be constructed on soils having the site or soil <br />conditions spe~fied ~a §8.30'.04 Subd. 7. <br /> <br />The soft percolation rate in all layers of the natural or fill soil <br />to a depth of at least 24 inches below the sand shall be faster <br />than 120 minutes per inch. <br /> <br />The allowable absorption area loading rate must be <br />detm-,,,~ued according to Table III by the percolation rate of <br />the 12 inches of original or fill soft immediately under the <br />sand layer. <br /> <br />l°~nted 1~28/90 <br /> <br />Page 255 <br /> <br /> <br />