Laserfiche WebLink
I <br /> I <br /> I <br /> i <br />:1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> CASE <br /> <br />REQUEST FOR SITE PLAN APPROVAL; CASE OF MIKE LEBLANC <br /> By: Zoning Administrator Sylvia Frolik <br /> <br />Background: <br /> <br />Mike Leblanc is requesting site plan review to construct an auto detail shop in the <br />Pineview Estates 2nd Addition PUD. This PUD is zoned for a combination of residential <br />and commercial uses. The following items are enclosed for your information: <br /> <br />a) <br />b) <br />c) <br />d) <br /> <br />Site location map <br />Proposed site plan and building elevations <br />City Staff review letter dated October 16,1997 <br />Proposed development permit <br /> <br />Notification: <br /> <br />Site plans are not subject to public hearings. The PUD is zoned for home businesses and <br />therefore, no notification of the pending development was provided to neighboring <br />property owners. <br /> <br />Observations: <br /> <br />Mike Leblanc is proposing to construct a 1,416 square foot commercial structure to house <br />his auto detail business, which equates to a .02% building coverage on the commercial <br />portion of the lot. This is in accordance with our general commercial regulation of <br />restricting the building coverage to 30% of the commercial property size. The covenants <br />for the Pineview Estates restricts the front 200 feet of the property for the residential use. <br />Mr. Leblanc's commercial building is proposed to be set back 200 feet from the front <br />property line. The building will be finished with vinyl siding and a brick wainscot on the <br />north wall facing 149th Avenue. <br /> <br />Access to the building (and home) is proposed along the east property line. The PUD <br />covenants would require the driveway to be situated on the west property line. However, <br />most of the lots in the PUD have developed with driveway locations determined by <br />personal choice and the consensus of the other homeowners in the PUD. Mr. Leblanc can <br />provide the City with confirmation that the other homeowners in the PUD do not object to <br />his placement of his driveway on the east property line. He would also have to provide the <br />City with a written statement agreeing to also accommodate a driveway along the west <br />property line in the event a residential/commercial use on Lot 1 requires it. In accordance <br />with code and the covenants, the driveway to the commercial building will be surfaced <br />with bituminous. <br /> <br /> <br />