Laserfiche WebLink
SECTION 6. CONTRACTOR'S EQUIPMENT <br />by <br />r <br />A. <br />All vehicles used the Contractor in picking up the recyclable materials from the residential properties <br />shall be painted and marked uniformly and shall be identified on both sides of the cab. Broom and shovel <br />in good usable condition shall be placed and maintained on each vehicle. <br />' <br />B. <br />The Contractor shall make all collections of recyclable materials in vehicles with closed tops on the load <br />portion so that contents will not spill or leak. All of the Contractor's receptacles and vehicles shall be kept <br />' <br />clean and as free from offensive odors as possible and shall not be allowed to stand in any street or other <br />place longer than is reasonably necessary to collect recyclable materials. <br />' <br />C. <br />The Contractor shall keep all equipment used in the performance of the work required by this Contract in <br />good operating condition and in a clean, sanitary condition and shall thoroughly wash each vehicle at least <br />' <br />twice each month or before each semi-monthly collection unless the same has not been used since the last <br />washing. All of the Contractor's equipment is subject to periodic inspection by the City. <br />SECTION 7. CONTRACTOR'S OPERATIONS <br />A. <br />The Contractor shall establish and maintain, in a location approved by the City Administrator, an office <br />staffed and capable of accepting complaints and customer calls. The office shall be in service during the <br />hours 8:00 5:00 days herein. The <br />' <br />of a.m. and p.m. on all of collection as specified address and telephone <br />number of the office shall be given to the City in writing. Any changes in address and telephone number <br />of the office shall be given to the City in writing at least ten (10) working days prior to such change. <br />B. <br />Complaints on service will be taken and collected by the City in addition to those received at the <br />Contractor's office. The City will notify the Contractor of all complaints it receives. The Contractor is <br />, <br />responsible for all corrective actions. A record of all such complaints and the action taken thereon shall be <br />kept by the Contractor and reported monthly to the City Administrator. All complaints shall be answered <br />' <br />by the Contractor courteously and promptly. <br />C. <br />The City shall notify the Contractor by 12:00 noon on the day following the scheduled pick-up of all <br />' <br />missed stops. The Contractor is required to service such locations before 5:00 p.m. on the date of <br />notification. <br />D. <br />The Contractor's employees shall handle all containers with reasonable care to avoid damage, shall <br />replace all containers in an upright position and shall immediately clean up and dispose of any recyclable <br />' <br />materials which may have fallen out of a container. <br />