My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 02/04/1997
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1997
>
Agenda - Planning Commission - 02/04/1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:05:36 AM
Creation date
9/23/2003 10:24:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
02/04/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey <br /> <br />1/14/97 <br /> <br /> We are requesting a conditional use permit for the <br />purpose of removing up to 2'00,000 cubic yards of sand fill <br />from our property at 6210 Green Valley Road. We have <br />submitted a plan showing contours of the existing hill as <br />well as wetlands to the south. We plan to have a finished <br />grade on the north slope of 874'0", with a 14 slope to the <br />south, with a south slope elevation of not less than 871'0". <br />This height is well above the 100-year high water level of <br />863'0". per the DNR. <br /> <br /> We do not plan to interfere with any of the <br />wetlands or Trott Brook, which is 350-400' south of the 871' <br />contour. <br /> <br /> This hill has few trees on it, with the exception <br />of about 15 cedar trees and six oaks. some of which are <br />dead. We plan to replant an equal number of spruce trees <br />along the swale near the west line of the excavation. <br /> <br /> We plan to sell the sand, having the trucks that <br />are hauling enter the property from Green Valley Road. using <br />the proposed haul road to the excavation site, as shown on <br />the s te plan. A silt fence will be maintained along the <br />south side of the excavation adjacent to the wetlands. The <br />topso I wll I be removed and stockpiled with no more than 50% <br />of the site having the topsoil removed at one time. The <br />topsoil wll I be used to restore the site. <br /> <br /> When the excavation is completed, we intend to use <br />the property for agricultural purposes, with the finished <br />grade well above the high-water level so as to leave the <br />property suitable for building. <br /> <br /> We are requesting the conditional use permit for <br />three to five years, with the option of receiving clean <br />fill, not to exceed 10.000 yards annually. <br /> <br />'Eric and Karla Thomsen <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.