Laserfiche WebLink
Work Plan <br /> <br />GENERAL <br /> <br />Our proposed basic engineering services would include all preliminary surveying, preliminary and <br />final design, permitting, plans and specifications, administration, and meetings required to design <br />the proposed 450-foot McKinley Street and utility project west of CSAH 57. Our proposed <br />construction services would include construction staking, full-time resident inspection, as-builts, <br />and project close-out. The plans and specifications would be designed as per Minnesota State Aid <br />(MSA) standards. We have staff available to start designing the project immediately, and propose <br />to have the plans and specifications completed for bidding by April 15,1996. <br /> <br />Our proposed project engineer, Mark Graham, P.E., would be <br />construction observation activities, and reviewing all shop drawings. <br />work item is given below: <br /> <br />in charge of all design, <br />A brief description of each <br /> <br /> I <br /> I <br />I <br />I <br />I <br /> <br />BASIC ENGINEERING SERVICES <br /> <br />Preliminary Investigations/Surveying - This work includes all preliminary data <br />gathering required to design and implement the proposed 450-foot McKinley <br />Street/Utility project. We propose to complete a preliminary survey of the project <br />site. This work would also include one to two meetings with the City of Ramsey <br />to gather all pertinent data, including as-builts of the adjacent streets and utilities, <br />and to finalize the scope of the project. <br /> <br />Preliminary Design - This work includes all preliminary design of the street <br />improvements, sanitary sewer risers, storm sewer, and watermain services. These <br />facilities shall be designed to meet MSA standards. <br /> <br />Prepare Permit Applications and Submittal Information - This work includes <br />preparing permit applications and submittal information for the Water Management <br />Organization, Ramsey County, Minnesota Pollution Control Agency, Department <br />of Health, and Metropolitan Council Wastewater Division. <br /> <br />Final Design - This work includes the final design of the proposed 450-foot street, <br />curb and gutter, sanitary sewer risers, storm sewer, minor grading of the street and <br />right-of-way, and watermain services. These facilities shall be designed to meet <br />MSA standards. This work also includes completing a final cost estimate. The <br />project shall be designed in AutoCADD Release 12.0/c format. The City shall <br />receive a hard copy of the project information, and a computer disk including as- <br />built and other pertinent information for the City's flies. <br /> <br />Administration - This work involves alt project administration, including <br />attending Council meetings and Planning Commission meetings as requested by the <br />City. This work also includes conferring with Ramsey County pertaining to the <br /> <br /> ! <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br /> <br />