My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/27/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 02/27/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:27:59 PM
Creation date
9/23/2003 1:27:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/27/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br /> <br />Work Plan <br /> <br />proposed improvements, soliciting and obtaining bids, reviewing shop drawings <br />and change orders, and providing project observation by a registered professional <br />engineer. <br /> <br />II. CONSTRUCTION SERVICES <br /> <br />provide Construction Staking - This work includes all construction staking <br />required by the City and Contractor to implement the proposed project. <br /> <br />Provide Construction Inspection This work includes full-time resident <br />inspection, or as requested by the City. The resident inspector would keep daily <br />records of all construction activities, review all payment requests, and tie out all <br />utilities for as-built records. <br /> <br />Ho <br /> <br />Preparation of As-builts/Project Closeout - This work includes preparing as-built <br />records, and coordination with the City and Contractor to close the project out. <br />We would complete a punch list for the Contractor showing items required to be <br />completed prior to the project closeout. Once all punch list items are completed <br />by the Contractor and meet City standards, we would complete a final pay request <br />and close the project out. The City would then receive a hard copy of the as-builts <br />and a computer disk with all pertinent information for your records. <br /> <br />Materials Testing Coordination - This work would include coordination of all soil <br />borings and material testing required to design and implement the proposed <br />project. We would obtain soil borings and material testing from a geotechnical <br />firm specified by the City. MSA typically uses American Engineering Testing, <br />Inc., as our subconsultant for geotechnical work. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.