Laserfiche WebLink
20. <br /> <br />and new plantings. It is herein agreed that the requirement for a Landscape Plan shall be <br />fulfilled by the DEVELOPER as follows: <br /> <br />(a) <br /> <br />Minimizing the impact of construction on trees in accordance with Minnesota <br />Extension Service publication "Protecting Trees From Construction Damage" <br />(Publication #NR-FO-6135-S). <br /> <br />(b) <br /> <br />Planting one two-inch d/meter tree (or equivalent thereof) of an approved species at <br />the road frontage or in the front yard of each of the lots in the Plat prior to the <br />issuance of a Certificate of Occupancy. In the event the weather is not conducive to <br />tree or sod planting at the time of Certificate of Occupancy, the Building Permit <br />holder shall place a cash deposit in the amount of $200.00 for trees and $100.00 for <br />sod in an escrow account with the CITY and upon verification of the planting being <br />accomplished, said cash deposit shall be refunded to the Building Permit holder. <br />Fa/lure of the Builder to comply with the planting requirement within a reasonable <br />time frame following a determination by the CITY that weather conditions are <br />conducive to planting shall give the CITY authority to cause the planting, the cost of <br />which shall be charged to the escrow account and the Builder shall not be eligible for <br />a refund of the cash deposit made for this purpose. <br /> <br />Tree Disease Prevention and Disposal. The DEVELOPER shall prevent the <br />introduction and spread of tree disease into the residual tree populations of the Plat and <br />adjoining properties and reduce the impacts of consmuction on the residual property of the <br />Plat and adjoining properties. The DEVELOPER in order to accomplish in accordance <br />with "Protecting Trees From Construction Damage" (attached hereto as Exhibit 'A'), shall: <br /> <br />(a) Install physical barriers, such as snow fence, around trees that are to remain. The <br /> fencing shall be located at the dripline of these remaining trees. <br /> <br />(b) <br /> <br />Insure that ail equipment operators will have readily available, a tree wound dressing <br />and will apply it immediately to damaged oak trees if wounding occurs from April 15 <br />through July 15. <br /> <br />(c) Insure that trees will only be skidded against other trees that are to be removed. Trees <br /> in the middle twenty (20) feet of a road easement will be removed first, with <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />'1 <br /> ! <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br /> <br /> <br />