1 <br />CASE # f �, <br />I PROPOSAL TO RETROFIT WELL NO. 1 TO INCREASE PUMPING CAPACITY <br />By: Steve Jankowski, City Engineer <br />' Background: <br />You will recall that the City recently retained BRA Inc. to develop Well No. 3 to increase the water <br />' utility's water sources. Unfortunately, the well will not be available for the peak day uses which <br />occur during the hot summer months and, as a result, we will have to rely on the purchase of water <br />from the City of Anoka to meet our peak days this summer. I project that on the peak summer day <br />we will need to purchase 1.4 million gallons of water. This exceeds the target supply level of one <br />' million gallons per day discussed in our original agreement with Anoka. <br />The current water agreement proposed by the City of Anoka provides for substantial increases in <br />' fixed monthly charges as the peak use day exceeds the one million gallon threshold. It would be <br />extremely helpful to reduce our dependence on the City of Anoka. <br />In reviewing the original well development records for Well No. 1, and by performing some <br />' additional test pumping late last month, it became apparent that Well No. 1 could be capable of <br />producing as much as 900 gpm in contrast to its current production of 550 gpm. This would <br />require the replacement of the current pump with a higher capacity pump and meter. <br />' At the time of this writing, I am awaiting information detailing the cost of the retrofit, however, I <br />do expect the artiount to run in the neighborhood of $40,000. There will be some rebates available <br />for the upgrades associated with more energy efficient equipment. In addition, I anticipate some <br />long -term savings on operational cost due to the higher efficiency of a line shaft turbine pump <br />versus the existing submersible. <br />' Time is also a critical factor in this upgrading. It is anticipated that the pump and motor will have a <br />two -week delivcry time, plus I would anticipate it may take from one to two weeks for the <br />installation. It 'would be possible to have the installation complete by the first part of May if <br />approval was gLVen at tonight's meeting and the City purchased equipment and installation labor <br />separately throu' h the quotation process. Since the cause of this expense is directly related to the <br />growth in the utity customer base, these costs should be considered appropriate for funding from <br />the WAC Fund or Utility Reserve Funding. <br />' Council Action: <br />' Based upon supplemental information and discussion. <br />Reviewed by: <br />' City Engineer <br />City Administrator <br />Finance Officer <br />CC: 03/26/96 <br />rmt <br />I wi <br />