Laserfiche WebLink
new and revised traffic control signal installations on Trunk <br />Highway No. 10 at County State Aid Highway No. 83 (Armstrong <br />Boulevard Northwest) and at County Road No. 56 (Ramsey Boulevard <br />Northwest); and <br />WHEREAS, it is anticipated that the new and revised <br />traffic control signals with street lights, EVP Systems, advance <br />warning flashers and signing and the interconnect is eligible for <br />80 percent Federal -aid Surface Transportation Program Funds; and <br />WHEREAS, it is considered in the public's best interest <br />for the State to provide a new cabinet and control equipment to <br />operate said new traffic control signal; and <br />WHEREAS, the County, City and the State will <br />participate in the cost, maintenance and operation of the new and <br />revised traffic control signals with street lights, EVP Systems, <br />advance warning flashers and signing and the interconnect, as <br />hereinafter set forth; <br />NOW, THEREFORE, IT IS AGREED AS FOLLOWS: <br />1. The State shall prepare the necessary plan, <br />specifications and proposal which shall constitute "Preliminary <br />Engineering ". The State shall also perform the construction <br />inspection required to complete the items of work hereinafter set <br />forth, which shall constitute "Engineering and Inspection" and <br />shall be so referred to hereinafter. <br />2. The contract cost of the work or, if the work is <br />not contracted, the cost of all labor, materials, and equipment <br />�! 74810 <br />'T y -2- <br />