Laserfiche WebLink
i� <br />74810 <br />-3- <br />y5 <br />r <br />rental required to complete the work, except the cost of <br />the <br />providing the power supply to service poles or pads, shall <br />' <br />constitute the actual "Construction Cost" and shall be so <br />referred to hereinafter. <br />3. The State with its own forces and equipment or by <br />contract shall perform the traffic control signal work provided <br />' <br />for under State Project No. 0202 -74, State Project <br />No.'s 199 - 010 -01, 199 - 020 -01 and 199 - 116 -01 and Federal -aid <br />Project No. STP 0296 (125) with the Construction Costs shared as <br />follows: <br />a) Trunk Highway No. 10 at County State Aid <br />Highway No. 83 (Armstrong Boulevard <br />Northwest). <br />' <br />1. Install a new traffic control signal <br />with street lights, advance warning <br />flashers and signing. S.P. 199 - 116 -01. <br />Estimated Construction Cost is <br />$171,000.00 which includes State <br />furnished <br />materials. Anticipated <br />' <br />Federal -aid share is 80 percent. <br />Anticipated State's share is 10 percent. <br />I County's <br />share is 5 percent. City's <br />share is 5 percent. <br />r 2. <br />Install EVP System. S.F. 199- 116 <br />-01 and <br />199- 020 -01. Estimated Construction Cost <br />i� <br />74810 <br />-3- <br />y5 <br />r <br />