Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br /> <br /> ATTACHMENT A <br /> <br />Lateral Benefit: Ramsey Elementary Watermain <br /> <br />Constr~ction Cost <br /> <br />Quanti _ty Item Unit Price Ext¢nsion <br />1;515 ft 2" D.I. watermain $18/ft $27,250 <br />13 each 8 x 8 tee $175/ea 525 <br />2 each 8" valve $525/ea 1,050 <br />2 each 6" valve $375/ea 750 <br />2 each 6" hydrant $1,600/ea 3.200 <br /> Total $32,775 <br /> <br />Project Overhead @ 30% of Construction Cost <br />Total Lateral Benefit <br /> <br /> $9,833 <br /> 32,775 <br />$42,608 <br /> <br /> <br />