Laserfiche WebLink
,! <br /> <br />Review Letter/~ Alloy Recovery Site Plan <br />February 21, 1996 <br />Page 2 of 2 ~ <br /> <br />~ The conditional use permit under which the facility is currently operating requires that <br />all outside stOrage be screened from public view to a degree of 90% opacity. It is staffs opinion <br />that the facilitit is not in compliance and although the expansion area will house a lot more of the <br />operation, the~ will still be some outside storage that is appropriate to be screened from the east, <br />west and south. Staff is recommending that a screening plan be submitted which would provide <br />for the establishment of a substantial mount of tree growth on these 3 lot lines. <br /> <br />Off Street Parltine - Number of St)aces: City Code requires 1 parking space for each person on the <br />maXimum working shift. The aplJlicant has indicated that although there are times when the facility <br />is operating 3 ~.hifts, the peak season staff remains to be six (6) employees. The site plan identifies <br />8 existing off-itreet parking spaces. <br /> <br />Off Street Parltine anO Drives - Design: The site plan permit for the construction of the original <br />facility waivedlcu~bing around pavement in the backyard; the curbing required around the perimeter <br />of pavement from the building front to the street has not been installed. The site plan is proposing <br />to expand the; paved area around the peimeter of the expansion structure. Staff is again <br />recommending; that all pavement from the front of the building to the front yard be finished with B- <br />612 concrete c!arbing, including the existing off-street parking area. <br /> <br />iI2raiaag~ Th~ topography of the site is relatively flat with natural drainage flowing from south to <br />north toward the existing ditch section in 142nd Avenue N.W. The proposed building will add <br />approximatelyi 0.25 acres of additional impervious rea. The north half of the building will <br />discharge roof rlrains onto the ground north of the building and flow over approximately 90 feet of <br />turf before being discharged into the south ditchline of 142nd Avenue. The south half of the <br />building must flow eastward and then northward to the street ditch. It is proposed a sump area be <br />graded west of '.the bituminous access drive to provide an opportunity for some infiltration of storm <br />water prior to discharge to the ditch. <br /> <br />The Planning Commission will be meeting at 7:30 p.m. on Monday, March 4, 1996, at the <br />Ramsey Municipal Center, 15153 Nowthen Blvd. N.W., to review the proposed site plan. A copy <br />of the case covi/r sheet is enclosed. You, or your representative, should be present at the meeting <br />to answer any questions that may arise. <br /> <br />If you have any questions, please call us at 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Zoning Admini:;tmtor <br /> <br />Steve Jankowski <br />City Engineer <br /> <br /> <br />