My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/23/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 07/23/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:34:29 PM
Creation date
9/24/2003 9:27:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Jankowski <br />Page 2 <br />July 19, 1996 <br /> <br /> · Solicit and obtain bids. <br /> <br /> · Confer with Ramsey City representatives prior to finalizing plans. <br /> <br /> · Provide project observation by a registered professional engineer. <br /> <br /> · Review shop drawings and change orders, prepare and certify <br /> payment requests. <br /> <br /> Estimated "not-to-exceed" cost for basic services: $8,200.00 <br /> <br /> Our estimated cost of technical service for the project are as follows: <br /> <br /> 2. Technical Services <br /> <br /> · Prepare a Right of Way Plat ~2,200.00 <br /> · Provide construction staking and inspection. $8,800.00 <br /> · Preparation of as-built plans. 900.00 <br /> <br /> Estimated cost of technical services provided by <br /> Hakanson Anderson Associates, Inc. ~ 11,900.00 <br /> <br /> Our estimated cost of sub-consultant services for soil borings and testing <br /> are as fotlows: <br /> <br /> 3. Sub-C~nsultant Service~ <br /> <br /> Soil borings* ~0 <br /> Testing services 2.000 <br /> Tota~ sub-consultant services $2,000 <br /> · Previously completed <br />All of the above costs are based on our current hourly rates and the estimated cost of <br />the basic engineering services is a not-to-exceed cost. The cost of the technical <br />services is an estimated cost and will depend on the contractor and the weather <br />conditions during construction. The above costs did not include permit fees or <br />miscellaneous expenses. The above sub-consuKant services are based on a cost plus <br />ten percent (10%) overhead cost and are for budgetary purposes. <br /> I-'~ Hakanson <br /> Anderson <br /> Assoc., Inc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.