Laserfiche WebLink
Work Plan <br /> <br />GENERAL <br /> <br />Our proposed basic engineering services would include all preliminary surveying, preliminary <br />and final design, permitting, plans and specifications, administration, and meetings. Our <br />proposed technical engineering services would include a right-of-way plat, construction <br />staking, full-time resident inspection, as-builts, and project close-out. The plans and <br />specifications would be designed as per Minnesota State Aid (MSA) standards. We have staff <br />available to start designing the project immediately, and propose to have the plans and <br />specifications completed for bidding by September 6, 1996. <br /> <br />Our proposed project manager, Mark Graham, P.E., would be in charge of all design, <br />construction observation activities and reviewing all shop drawings. A brief description of <br />each work item is given below: <br /> <br />I. BASIC ENGINEERING SERVICES <br /> <br />Preliminary Investigations/Surveying/Legal Descriptions - This work includes all <br />preliminary data gathering required to design and implement the proposed project. <br />We propose to complete a preliminary survey of the project site. This work would <br />also inchide one to two meetings with the City of Ramsey to gather all pertinent data, <br />including as-builts of the adjacent streets and utilities, and to finalize the scope of the <br />project. This work would also include preparing the legal descriptions for the right- <br />of-ways of 1,700 feet of McKinley Street and 200 feet of Azurite Street. <br /> <br />Preliminary Design - This work includes all preliminary design work for the street <br />and curb and gutter design, sanitary sewer risers, storm sewer, and watermain <br />services. All facilities shall be designed to meet MSA standards. <br /> <br />Prepare Permit Applications - This work includes preparing and submitting permit <br />applications for the Water Management Organization, Minnesota Pollution Control <br />Agency, Department of Health, and Metropolitan Council Wastewater Division. <br /> <br />Final Design - This work includes the final design of the proposed street, curb and <br />gutter, sanitary sewer risers, storm sewer, minor grading of the street and right-of- <br />way, and watermain services. These facilities shall'be designed to meet MSA <br />standards. This work also includes completing a final cost estimate. The project <br />shall be designed in AutoCADD Release 12.0/c format. The City shall receive a <br />hard copy of the project, and a computer disk including as-built and other pertinent <br />information for the City's files. <br /> <br />Administration - This work includes all project administration, including attending <br />one to two:Council or Planning Commission meetings as requested by the City. This <br />work also_ includes conferring with Ramsey County pertaining to the proposed <br /> <br />900/001 - 1605.jul <br /> <br /> <br />