Laserfiche WebLink
· <br /> <br />Work Plan <br /> <br />improvements, soliciting and obtaining bids, reviewing shop drawings and change <br />orders, and providing project observation by a registered professional engineer. <br /> <br />II. TECHNICAL ENGINEERING SERVICES <br /> <br />F, Provide Right-of-Way Plat - This work include supplying the City with a right-of- <br /> way plat for the proposed project. <br /> <br />G. Provide Construction Staking - This work includes all construction staking required <br /> by the City and Contractor to implement the proposed project <br /> <br />Provide Construction Inspection - This work includes full-time resident inspection, <br />or as requested by the City. The resident inspector would keep daily records of all <br />construction activities, review all payment requests, and tie out all utilities for as- <br />built records. <br /> <br />Preparation of As-builts/Project Closeout ~ This work includes preparing as-built <br />records, and coordination with the City and Contractor to close out the project. We <br />would complete a punch list for the Contractor showing items required to be <br />completed prior to the project closeout. Once all punch list items are completed by <br />the Contractor and meet City standards, we would complete a final pay request and <br />close the project out. The City would then receive a hard copy of the as-builts, and a <br />computer disk with all pertinent information for your records. <br /> <br />Materials Testing Coordination - This work would include coordination of all soil <br />borings and material testing required to design and implement the proposed project. <br />We would obtain soil borings and material testing from a geotechnical firm specified <br />by the City; MSA typically uses American Engineering Testing, Inc., as our sub- <br />consultant for geotechnical work. <br /> <br />900/00 I- 1605.jul <br /> <br /> <br />