Laserfiche WebLink
FROM: <br /> <br /> TO: <br /> <br /> PARTIAL PAYMENT ESTIMATE <br /> <br /> NO. i <br /> <br />JULY 22, 1996 <br />AUGUST 14, 1996 <br /> <br />CONTRACTOR: <br />ADDRESS: <br />OVVNER: <br />PROJECT: <br /> <br />YOLK SEWER a WATER, INC. <br />8909 BASS CREEK COURT, BROOKLYN PARK, MN 55428 <br /> <br />CITY OF RAMSEY, MINNESOTA <br />MCKINLEY STREET N.W. (658~001-30) <br /> <br />CObtPLETION DATE AMOUNT OF CONTRACT: <br /> <br /> ORIGINAL: SEPTEMBER 6, 1996 ORIGINAL: 196,788,50 <br /> REVISED: REVISED: <br /> <br /> i <br /> <br /> 2 <br /> <br /> 3 <br /> <br />4 <br /> <br />5 <br /> <br /> 6 <br /> <br /> 7 <br /> <br /> 8 <br /> <br /> 9 <br /> <br />10 <br /> <br />11 <br /> <br />12 <br /> <br />13 <br /> <br />14 <br /> <br />15 <br /> <br />16 <br /> <br />17 <br /> <br />18 <br /> <br />19 <br /> <br />20 <br /> <br />21 <br /> <br />SCHEDULE 1,0 STREET CONSTRUCTION <br />MILL EXISTING BITUMINOUS SY 40 4,00 0.00 0.00 0.00 0.00 <br />CLEARING & GRUBBING. LS I 500.00 1.00 500.00 1.00 500.00 <br />COMMON EXCAVATION (PI CY 20,363 1,12 20,363.00 22,806.56 20,363.00 22,806.56 <br />SUBGRADE PREPARATION 0- 12' RDSTA 9 153.00 0.00 0.00 0.130 0.00 <br />AGGREGATE BASE, CLASS 5 TON 2,50(I 6.88 0.130 0.00 0.430 0.00 <br />TYPE 4lA, WEAR COURSE MIXTURE TON 550 24.74 0.00 0.043 0.130 0.00 <br />TYPE 3 lB, BASE COURSE MIXTURE TON 675 23.46 0.00 0.00 0.0~ 0.00 <br />BIT. MATERIAL FOR TACK COAT GAL 265 1.00 0.(30 0.043 0.00 0.00 <br />CONCRETE CURB & GUTTER, B618 LF 2,020 6.53 0.00 0.00 0.00 0.00 <br />RECONSTRUCT SANITARY MANHOLE EA 2 50.00 2.00 100.00 2.00 <br />SEED1NG,//250 AC 1,5 1,275.00 0.130 0.00 0.043 0.00 <br />SEEDING, #900 AC 1.5 765.00 0.00 0.00 0.00 0.00 <br />SODDING, LAWN & BLVD. SY 450 3.57 0.00 0.00 0.00 0.00 <br />MULCH TYPE 5 GAL 1.500 1.00 0.00 0,00 0.00 0.130 <br /> <br />SUBGRADE DENSITY TEST, INPLACE EA 5 37.74 0.00 0.12)0 0.00 0.00 <br /> <br />CLASS 5 GRADATION TEST EA 1 61~20 0.00 0.0~ 0~00 0.(30 <br />CLASS 5 PROCTOR TEST EA I 86.70 0.00 0.09 0.00 0.00 <br /> <br />CLASS 5 DENSITY TEST, INPLACE EA 10 37.74 0.0(3 0.00 0.130 0,00 <br /> <br />CONC. CYL. COMPRESS. TEST (SET OF 3) EA 3 30.60 0.00 0.00 0.00 0.00 <br />CONC. AIR ENTRAINMENT TEST EA 3 71,40 0.00 0.00 0.00 0.00 <br />CONC. SLUMP TEST EA 3 71.40 0.00 0.00 0.00 0,00 <br /> <br />SCHEDULE 1.0 STREET CONSTRUCTION - TOTAL <br /> <br />23,406.56 23,406.56 v/ <br /> <br /> SCHEDULE 2.0 WATERMA~ <br /> I CONNECT TO EXISTING WATERMAIN EA 2 <br /> 2 6' DIP LF 275 <br /> 3 I0' DIP LF 1,785 <br /> 4 FITTINGS LBS 3,800 <br /> 5 HYDRANTS WITH VALVE EA 2 <br /> <br />~658001#1.XLS <br /> <br />PAGE I <br /> <br />100.00 2.00 200.00 2.00 200.00 v/ <br />14.00 252.00 3,528.00 252.00 3,528.00'./' <br />18.50 1,800.00 33,300.00 1,800.00 33,300.00 <br />1.00 2,200.00 2,260.00 2,260.00 2,260.00 v/ <br />1,6(K).00 2,00 3,200.00 2.00 3,200.00 v/ <br /> <br />658-001-30 <br /> <br /> <br />