My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/09/1996
Ramsey
>
Public
>
Agendas
>
Council
>
1996
>
Agenda - Council - 09/09/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 3:35:08 PM
Creation date
9/24/2003 11:22:11 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/09/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Phase 4 contimted) <br /> <br />C. At contractor's choice he may select from the following two options: <br /> <br /> 1. All walls --remove all wall plaster and lath for new bart insulation, vapor retarder, <br /> gypsum board (taped and sanded) and wainscot installation. <br /> <br /> 2, All walls --remove damaged plaster and patch as required, blow-in insulation into <br /> exterior stud cavities and patch associated holes, install vapor retarder, gypsum board <br /> (taped and sanded) and wainscot directly over existing plaster <br /> <br />D. Patch in opening where pass thru is. <br /> <br />E. Widen interior door openings to larger 3'-0" door size openings (excluding door to stair) <br /> <br />F. Electrical and plumbing rough-in work. <br /> <br /> Phase 5 <br /> The intent of this phase is lo complete the interior. <br /> <br />A. In main room install new tin ceiling and cove to match existing <br /> <br />B. Install new accessible uni-sex toilet room in old kitchen location, including fixtures and ceramic tile <br /> <br />C. Strip salvaged trim components and fill holes <br /> <br />D. Install and finish all trim and doors <br /> <br />E. Floor (where required) 1. Remove bad or damaged portions of existing flooring thru-out, patch to match <br /> 2. Re-nail flooring <br /> 3. Saw-tooth in matching flooring <br /> 4. Provide level access between main room and toilet and entry area <br /> 5. Resurface flooring as needed (or not?) and refinish <br /> <br />F. Finish all other surfaces - ceiling, cove, walls. <br /> <br />G. Mechanical and electrical fixture installation and trim <br /> <br />H. Install hardware <br /> <br />I. Install air conditioning <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />! <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.