Laserfiche WebLink
Architectural Standards; The Copper Sales building was proposed with an exterior finish <br />consisting of painted concrete block with a pre-finished metal application to the top 1/3 of <br />the structure. The Heritage building is proposed with an exterior finish of precast concrete <br />panels with a 12" &¢orative metal band around the top. <br /> <br />Recommendation: <br /> <br />The deviations from the approved site plan are very minor and City Staffrecommends that we enter <br />into an agreement with Heritage Millwork for the development of Lot 1, Block 3, Business Park <br />95 Second Addition. <br /> <br />Council Action: <br /> <br />Motion to: <br />Confmu the assumption of the development of Lot 1, Block 3, Business Park 95 ~econd <br />Addition by Heritage Millwork. <br /> <br />Review Checklist: <br /> <br />CC: <br /> <br />City Administrator <br />City Engineer <br /> <br />11/26/96 <br /> <br /> <br />