Laserfiche WebLink
The only baseball field will be regulation size with 90' base paths, thereby accommodating adults <br />as well as organized and informal pla>,. The field is sited away from the softball fields eno other <br />areas te minimize conflicts from the games intensity and generally older players (softball fields are <br />generally acceptable to baseball players through the middle school ages). While this field might <br />require an outfield fence, the backstop ma>, not need to be of the caliper of the one located at <br />Centr',d Park, and, therefore, construction costs rrm>, be only slightly higher than the softball fields. <br />The geo~m"aphic alignment is an issue of moderate importance due to the velocity of baseball pla>,. <br />This orientation places neither the infielders (most importantly the pitcher) or the batter at a "sun in <br />the eyes" disadvantage in the typical late afmrnoordevenmg game. <br /> <br />The Pond <br /> <br />The Park's pond will be the focal point of the passive activities of the re,cation area, The pond's <br />aesthetic and recreational value could be enhanced in a number of ways. <br /> <br />One community-wide benefit would be to introduce brook trout for fishing and consumption. Part <br />of an), operational expense could be defrayed by a local fishing permit cost. The spring "opener" <br />could be a festive occasion with a tagged fish providing a significant prize. The tagged fish caught <br />subsequent to the opener might provide the angler with a lifetime Ra.msey fishing permit. If it is <br />determined that the fish cannot survive over winter they could be netted with a resulting fish fry or <br />possibly release into Trort Brook. <br /> <br />The pond would have a dock, bridge or both. Approximately one haft of the pond will be <br />"manicured", w/th the rest "wild", and also a small portion to the south actually fenced to protect <br /> <br />Dredging would make the pond more suitable for wildlife, particularly aquatic species, such as <br />fish. The dredged material would supplement topsoil in the borrow area. <br /> <br />One possibility would be to route a portion of the treated water from the lariat'ill to the pond for a' <br />fountain. "finis would ~so serve as aeration and to maintain desked water levels. <br /> <br />The primary activity around the pond will be picrficking. The ponds shape could be altered and a <br />beach area then created. A beach to the north would ~ve excellent sun exposure, and something <br />not available to this part of the county. <br /> <br /> <br />