My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/02/1996
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1996
>
Agenda - Planning Commission - 01/02/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 8:59:58 AM
Creation date
9/25/2003 3:11:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/02/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Plan Review[ Ramsey Multi-Tennant II <br />December 28, 19p5 <br />Page 2 of 2 <br /> <br />Waste S~9rage: City Code requires that all solid waste and refuse receptacles shall be <br />stored wi0fin a completely screened structure or container. The site plan does not indicate a <br />waste storage area for Phase 11 in accordance with City Code and the plan should be <br />amended [accordingly. <br /> <br />Off Stree! Parking - Design: In accordance with City Code, the off-street parking areas and <br />drive lan~s are proposed to consist of a bituminous surface, the perimeter of which is <br />finished ~rith B-612 concrete curbing. <br /> <br /> Qff Street Parking - Spaces Required: With the addition, the total facility will consist of <br /> 9,641 square feet of office space and 54,657 square feet of warehouse space. Using a <br /> standard~f 1 parking space for every 200 square feet of office space and 1 parking space <br /> for everyI2,000 square feet of warehouse space, a total of 75 parking spaces are required. <br /> The totfl number of parking spaces provided in the first and second phase of the <br /> development is 175. <br /> <br /> City Code requires a minimum of three loading docks for the total facility <br /> h loading dock should measure at least 12' x 60'. There are seven loading <br /> docks proposed for this phase that meet the size requirements. <br /> <br /> ~ The exterior lighting plan is shown on the site plan and is acceptable. Any <br /> lighting t~sed to illuminate the site should be arranged to deflect light away from adjacent <br /> propertie.~ and roadways. <br /> <br /> The grading plan for this second phase was anticipated during the initial phaseof <br /> pment. The drainage for this phase was anticipated and installed under Phase I <br /> of this development. <br /> <br />The Planning Commission will be meeting at 7:30 p.m. on Tuesday, January 2, I995, at the <br />Ramsey Municipal Center, 15153 Nowthen Blvd. N.W., to review the proposed site plan. A copy <br />of the case cove~.sheet is enclosed. You, or your representative, should be present at the meeting <br />to answer any qt/estions that may arise. <br /> <br />If you have any questions, please call us at 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik <br />Zoning Adrrdnisttator <br /> <br />Steve Jankowski <br />City Engineer <br /> <br />Harming ~and Zoning Commission <br />Parks & Utilities Supervisor Mark Boos <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.