My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/10/1996 - Special Commission
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1996
>
Agenda - Planning Commission - 01/10/1996 - Special Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:00:06 AM
Creation date
9/25/2003 3:14:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special Commission
Document Date
01/10/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> <br />rate[volume of runoff must not exceed the pre-developed rate/volume of runoff <br />for ~he 10-year, 24 how storm., uti ,!Lzin~ !~e "SCS Method" with a CUrve number <br />dete~rmined using Group C soils as a minimum. <br /> <br />A p~,rmit for work within the'County Right-of-Way is required and must be <br />obt ,a~ined prior to the commencement of any construction. Contact Roger Butler, <br />Trat~fi, c EnginEering Coordinator for this department, for further information <br />regakding the permit process. <br /> <br />It st~' uld be noted that residential land use adjacent to highways will usually <br />result in complaints regarcling traffic noise. Traffic noise at this location <br />coul~l exceed Noise Standards estabkished by the US Department of Housing and <br />Urblm Development and the Minnesota Pollution Control Agency. Anoka County <br />poli~ regarding new developments adjacent to existing County Highways prohibits <br />the ~xpendimre of highway funds for noise mitigation measures. The City and/or <br />the Ipeveloper shouldassess the noise situation and take any action deemed <br />neci-ssary to min~mlze associated impacts at this site from any traffic noise. <br /> <br />Thank you for the opportunity to comment. Please keep this department informed as plans <br />for this site !are developed further. The City or the Developer should contact me when <br />constructio~t of the new city streets are near completion, sot that stop sign installations at <br />CR 56 and CR 116 can be coordinated by this department. Feel free to contact me if you <br />have a_ny questions. <br /> <br />NjJa~'i p~nbie <br /> Traffic Engbaeer <br /> <br />xc: <br />xC: <br /> <br />Roger Butler, Traffic Engineering Coordinator <br /> <br />Skip ~Anderson, County Surveyor <br /> <br />Sylvia Frolik, City of Rarnsey <br /> <br />dmh/1RAMBLVD <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.