Laserfiche WebLink
City of Ramsey <br /> <br />15159 NOWTHEN BOULEVARD N.W., RAMSEY, MINNESOTA 55303 <br /> <br />PHONE (612) 427-1410 FAX (612) 427-5543 <br /> TDD (612) 427-8591 <br /> <br />February 21, 1996 <br /> <br />Jon Schwartzman <br />2905 N. Ferry Street <br />Anoka, Mn 55303 <br /> <br />Re: <br /> <br />Site Plan Review <br />Expansion of Alloy Recovery Company <br /> <br />Dear Jon: <br /> <br />We are in receipt of your proposal for a 9,000 square foot expansion to the existing facility at 7060 <br />142nd Avenue N.W. The site plan consists of one (1) sheet prepared by John Oliver and <br />Associates, dated February 2, 1996. We are also in receipt of building elevadons consisting of <br />two (2) sheets prepared by Phillip D. Johnson, Architect, dated February 2, 1996. We offer the <br />following comments: <br /> <br />.~Zoning: The site is zoned Industrial and the aluminum processing facility was established at tiffs <br />location by a conditional use permit issued in 1991. The expansion of the facility w/Il require an <br />amendment to the conditional use permit. <br /> <br />~ The subject site is approximately 2.5 acres in size or 108,900 square feet. Lot <br />coverage in the Industrial District is restricted to 35% of the lot area or 38,115 square feet in this <br />case. The total area of the existing buildings and the expansion area is 13,020 square feet. <br /> <br />Setbacks; The proposed expansion is in compliance with the 40 foot front, 35 foot rear and 20 <br />foot side yard setbacks. <br /> <br />Utilities: Sanitary sewer and municipal water are currently not available to the sim. <br /> <br />Architectural Standards: City Code requires that at least 50% of the exterior facing f'mish of the <br />structure be other than metal. At the time the original facility was constructed, Council permitted a <br />deviation from these architectural standards and only required upgrading the building front. The <br />building elevations submitted for the expansion propose to continue the application of horizontal <br />vinyl siding and molded brick siding to the lower half of the building front facing t42nd. The site <br />plan also proposes to wrap these upgrades around the east elevation of the expansion up to the wall <br />of the existing structure. As w/th the existing structure, the west and south elevations are proposed <br />to consist of ribbed metal panels only. <br /> <br />~ Any lighting proposed for the expansion was not identified on the site plan. The lighting <br />plan is subject to the approval of the City Engineer. <br /> <br />Landscaping: The landscaping improvements approved in the site plan for the construction of the <br />original building specified the planting of 5 Spruce, 2 Ash and 1 Maple tree, On a visit to the site <br />earlier this week, it appears that only 1 Ash was planted and it appears to be in stress. Staff is <br />recommending that a revised landscape plan be drafted for this addition that will focus on some <br />substantial screening of operations from public view. <br /> <br /> <br />