My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 04/02/1996
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1996
>
Agenda - Planning Commission - 04/02/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:00:26 AM
Creation date
9/25/2003 3:38:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
04/02/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Letter:.. Alloy Recovery Site Plan <br />February 2I, 11996 <br />Page 2 of 2 <br /> <br />~ The conditional use permit under which the facility is currently operating requires that <br />all outside st.~rage be screened from public view to a degree of 90% opacity. It is staffs opinion <br />that the facili..t'y is not in compliance and although the expansion area will house a lot more of the <br />operation, th ,6i'e will still be some outside storage that is appropriate to be screened from the east, <br />west and soufla, Staff is recommending that a screening plan be submitted which would provide <br />for the establishment of a substantial amount of tree growth on these 3 lot lines. <br /> <br />Off Street p .a.r~dng _ Number of Spaces: City Code requires 1 parking space for each person on the <br />maximum wolrking shift. The applicant has indicated that although there are times when the facility <br />is operating 3 lshifts, the peak season staff remains to be six (6) employees. The site plan identifies <br />8 existing offastreet parking spaces. <br /> <br />Off Street Pm <br />facility waive~ <br />of pavement <br />to expand th <br /> <br />~ng and Drives - Design: The site plan permit for the construction of the original <br />· curbing around pavement in the backyard; the curbing required around the perimeter <br />· om the building front to the street has not been installed. The site plan is proposing <br />e paved area around the peimeter of the expansion structure. Staff is again <br /> <br />recommendin ~ that all pavement from the front of the building to the front yard be firfished with B- <br />612 concrete ,iurbing, including the existing off-street parking area. <br />~ Th,e topography of the site is relatively fiat with natural drainage flowing from south to <br />north toward ~he existing ditch section in 142nd Avenue N.W. The proposed building will add <br />approximatellt 0.25 acres of additional impervious rea. The north half of the building will <br />discharge roo~ drains onto the ground north of the building and flow over approximately 90 feet of <br />turf before bOing discharged into the south ditchline of 142nd Avenue. The south half of the <br />building mustiflow eastward and then northward to the street ditch. It is proposed a sump area be <br />graded west of the bituminous access drive to provide an opportunity for some iafiltration of storm <br />water prior to discharge to the ditch. <br /> <br />The Planning Commission will be meeting at 7:30 p.m. on Monday, March 4, 1996, at the <br />Ramsey Munipipal Center, 15153 Nowthen Blvd. N.W., to review the proposed site plan. A copy <br />of the case coyer sheet is enclosed. You, or your representative, should be present at the meeting <br />to answer any ;questions that may arise. <br /> <br />If you have any questions, please call us at 427-1410. <br /> <br />Respectfully, <br /> <br />CITY OF RAMSEY <br /> <br />Sylvia Frolik · <br />Zoning Admints~ator <br /> <br />Steve Jankowski <br />City Engineer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.