Laserfiche WebLink
CITY OF RAMSEY <br />SCHEDULE OF RATES, FEES AND CHARGES <br />Adopted November 22, 1994 <br /> <br /> 1995 <br /> SERVIC~ OR LICENSE SPECIAL NOTES Adopted <br /> TILITY RATES , <br /> <br /> Residential Curb-side Progr~m fee/qtr [as adopted 8/22/94] 3.05 <br /> Residential usage fee/qtr i 43.90 <br /> Multi-family & commercial ]J~sage fee/qtr 43.90+2.20/1000 gal. <br />; in excess of 20,000 gal. <br />Connection charge/res equivalent inc by current construction index 477.00 <br />Connection charge/acre residential inc by current construction index 1,432.00 <br />Connection charge/acre corn~/ind inc by current construction index 2,625.00 <br />Lateral Benefit Charges inc by current construction index 2,706.00 <br />Developer contribution: <br />installation of Cobra street light 700.00/light <br />traditionaire subdivision!street light (w/100 ft of wire) 500.00flight <br />street light O & M 3 ye~ @ $90/year 270.00flight <br />Residential billing: <br />urban subdivision streetiight rate per lot 8.25/quarter <br />rural subdivision street light rate vet lot <br />priority street light rate t}er lot <br />Usage fee per lk gallons 1.15 <br />Minimum usage fee/qtr 17.25 <br />Installation of meter w/remoie 78.00 <br />5/8" Meter with hom 117.00 <br />__P'..eplacement Meter Hom r 17.00 <br />Uther than 5/8" meter Cost plus 15% <br />Reconnect fee 50.00 <br />Permit use per lk gallons 5.00 <br />Connection charge/res equiv{tlent inc by current construction index 1,062.00 <br />Connection charge/acre residential inc by current construction index 3,187.00 <br />Connection charge/acre conu~/ind inc by current construction index 5,843.00 <br />Lateral Benefit Charges , inc by current construction index 6,022.00 <br /> <br /> <br />