I <br /> <br /> I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />G. Review shop drawings, change orders, prepare and certify payment requests: <br /> <br />RLK will revi0w and approve shop drawings as required. The review will be completed on a timeIy <br />manner so flmt~.~the construction operations will not be delayed. If necessary, change orders will be <br />prepared for ¢ ~l~mnges in scope of work. The City will be notified immediately of pending change <br />orders in orderito receive the City's input to the change order. After a change is deemed necessary, <br />a written chan/~e order will be prepared for approval. <br /> <br />On an agreed tt~°°n periodic basis, estimates of the value of work completed to date will be <br />prepared indic.~ug the approximately quantities of work completed under each item of work. <br /> <br />A registered professional engineer will be responsible for the completion of the above tasks. <br /> <br />TASK2-TECHNICALSERVICES <br /> <br />A. Provide c~nstruction staking and inspection: <br /> <br />RLK will provide construction staking and inspection to insure that the sewer and wa~rmain are <br />constructed in ~c. cordanee to the plans and specifications. Some of the important responsibilities <br />and tasks ofth~'inspection will be: <br /> <br />Review the progress of the construction work and bring to attention o£the contractor any <br />unsatisfactory ~r incomplete work. <br /> <br />Ensure that the f'°ntractor provides the necessary traffic control in accordance with the latest <br />edition of the ~esota Manual on Uniform Traffic Control Devices. <br /> <br />Observe eonstniction operations and schedule compaction testing to insure that backfill material is <br />compacted to thig~ acceptable density as specified in the specifications. <br /> <br />"Weekly conS~_etion Diary and Statement of Working Days" will be completed and submitted no <br />later than five ci!~ endar days following the work covered by the report, <br /> <br />RLK will hold W, eekly construction meetings with the contractor, subcontractors and other <br />interested partie~. This meeting will serve to coordinate all construction activities and insure that <br />the constructaontproceeds at the established schedule. <br /> <br />Changes made d_uring construction will be shown in red on a set of blue line plans and will be <br />current at all tin~. Final as-built drawings will be prepared upon completion of the project and <br />submitted showiitg actual layouts, alignments: inverts and grades. <br /> <br />B. Obtain nec~sa~ soil borings: <br /> <br />GME Consultants will provide the required soils investigation. RLK Associates will work with the <br />City and propert~r owners so that soil borln~ would be obtained during the winter months for the <br />sanitary sewer li~ e. This is being proposed so there is less disturbance to the wetlands and less <br />disruption to the property owners. <br /> <br /> <br />