Laserfiche WebLink
I <br />,I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> <br />CASE # <br /> <br /> IMPROVEMENT PROJECT g95.12 <br />RU~M RIVER DRAINAGE DISTRICT IMPROVEMENTS <br />By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />Tonight's publ~ hearing is being held due to certain drainage problems that currently exist <br />in Section #22~ The City Council has directed City Staff to prepare a feasibility study for <br />the proposed d~ainage improvements located in Section #22. A copy of that feasibility <br />study which de_gcribes the existing conditions and proposed project is attached. <br /> <br />This public he~ring is being conducted with the intent of assessing th~ cost of this project <br />against the Ruqa River Drainage District. This drainage district was created on November <br />25, 1986, to p~'ovide a funding source for the construction or drainage improvements <br />within the district. The attached map shows the extent of the Rum River Drainage Districts <br />which covers r~ughly two-thirds of the City and includes approximately 3,900 properties. <br />This is the firs~ project proposed to be assessed against this district. Enclosed for your <br />review is the fOllowing information: <br /> <br /> 1) Copy of Public Hearing Notice <br /> 2) Feasibility Report on Project g95-12 <br /> 3) Location Map of Drainage Districts <br /> 4) Resolution for Adoption <br /> <br />Also attached tltre any letters/comments received to date. We will deliver any additional <br />comments to thb Council meeting. <br /> <br />Council ActiOn: <br />Motion to adopt Resolution g95-03~ ~rdering the project and the preparation of plans <br />and specifications for Improvement Project g95-12. <br /> <br />Reviewed by: <br /> <br />City Engineer <br />City Administrator <br />Economic Devdlopment Coordinator <br /> <br />CC: 03/14/95 <br /> <br /> <br />