Laserfiche WebLink
Item ~ <br /> <br />Storm Sewer <br />12" RCP <br />15" RCP <br />15" FES <br />Catch Basin (2'x 3') <br />Storm manhole <br />Rip rap <br />Grade seal pond <br /> ;Subtotal <br /> 7 <br /> <br />Streets <br />Remoge bit paving <br />Surm concrete curb gutter <br />Sub ~ade preparation <br />Class 5 <br />2" bitUminous wear course <br />Turf establishment <br />DriveWay restoration <br />Street lights <br /> Subtotal <br /> <br /> 7 <br />GRAND TOTAL <br /> <br />Ouantity <br /> <br /> 30If <br /> 300 If <br /> lea <br /> 2 ea <br /> lea <br /> 9 cu yd <br /> L.S. <br /> <br />4,000 sq yd <br /> 2,300 If <br /> 11.5 rs <br /> 805 tons <br /> · 430 tons <br /> lacre <br /> 5ca <br /> 4ca <br /> <br /> I.P. #95-14 <br />Unit Price ~ <br /> <br /> D/If $ 450.00 <br /> 19/1t7 5,700.00 <br /> 450/ca 450.00 <br /> 725/ea 1,450.00 <br /> 900/ca 900.00 <br /> 60/yd 540.00 <br /> 3,000.00 3.000.00 <br /> $ I2,490.00 <br /> <br />Unit Price <br /> <br /> 3/sq yd <br /> 4.80/lf <br /> i80/rs <br /> 6/ton <br /> 25/ton <br /> 1,500/acre <br /> 500/ca <br /> 500/ca <br /> <br />I.P. #95-14 <br /> <br />$12,000.00 <br />11,040.00 <br />2,070.00 <br />4,830.00 <br />10,750.00 <br />1,500.00 <br />2,500.00 <br />2.000.00 <br />$ 46,690.00 <br /> <br />$120,635.00 <br /> <br />Project <br />Construction <br />Gost <br /> <br />$ 450.00 <br />5,700.00 <br />450.00 <br />1,450.00 <br />900.00 <br />54O.0O <br />3.000.00 <br />$12,490.00 <br /> <br />Project <br />Construction <br />Cost <br /> <br />$ 12,000.00 <br />11,040.00 <br />2,070.00 <br />4,830.00 <br />I0,750.00 <br />1,500.00 <br />2,500.00 <br />2.000.00 <br />$ 46,690.00 <br /> <br />$ 98,715.00 <br /> <br /> I <br /> I <br /> I <br /> ! <br /> <br /> I <br /> ! <br /> <br />I <br /> <br />I <br />I <br /> <br />i <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />