Laserfiche WebLink
I <br />,I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br /> <br />The above figure~ account for the purchase of the properties that currently are developed with a <br />business. These [figures do not include the purchase of the vacant/raw land that would be <br />associated with the interchanges extending outside of the currently projected right-of-way. <br /> <br />These figures as~.ume that the right-of-way is purchased as shown. If the right-of-way is <br />adjusted either w~y, these numbers would change. <br /> <br />The relocation ofithe businesses would depend upon the type of business. For, instance if the <br />project required f. elocation of the propane business, estimated costs are $20,000 to $50,000, <br />depending on the ~reusability of the storage tank. This business would not be displaced by the <br />locating of the proposed interchange as shown on the attached map. The car lots and farm <br />center relocation ~costs would be based upon the moving of the cars and other inventory but <br />should not excee{1 $15,000 per business (Bud Storm, Evergreen Land Services, 566-1036). <br />To have a prelimi0ary estimate done would cost $100-$200. <br /> <br />Property values are from County tax records and may vary from market conditions. 'No <br />figures are shown!for any acquisition expense such as legal or appraisal fees.. <br /> <br />It should be noted that both the Planning Commission and Economic Development <br />Commission have~ recommended the area between Ramsey Boulevard N.W. and Armstrong <br />Boulevard N.W., [along the north side of Highway gl0, as green space. In this green space, <br />there are currently nine businesses with an estimated market value of $1,179,100. To impact <br />all of these businesses, a project including up to 2,500 feet on either side of the existing right- <br />of-way of the eastern alignment would be required. <br /> <br />While the westerli alignment shows the corridor over an existing business, acquisition of this <br />property (beyond .'land) was not suggested (except for the interchange example shown above). <br />The rationale is ~at the alignment could be shifted east or west to avoid purchase of the <br />property. A similar circumstance likely could result for the eastern alignment regarding <br />business acquisition. <br /> <br />· Right-of-way for bridge alignment was estimated to be 200 feet wide. <br /> <br />· Right-of-way for County Road #116 was estimated to be 150 feet wide. <br /> <br />Based upon the above, the criteria we considered was property acquisition and roadway (not river <br />bridge) construction (!ncluding highway/railroad bridging). For this analysis, we did not provide <br />any breakdown regarr4jting transportation impact on neighborhoods or assumed drive miles from <br />any point to any other point. While there has been significant discussion on marketability of <br />adjacent land, tl-fis als01 was not reviewed within this analysis. Pursuant to the above: <br /> <br />North/south right-of-Way acquisition <br />C.R. #116 acquisitionito_Ramsey/Armstrong Blvd N~W. <br />North/south roadway Construction <br />Highway #10/B.N. bridge construction <br />County Road #116 roadway construction <br />Possible approach acquisition <br />Estimated approach rei~'ocation <br /> TOTAL COST <br /> <br /> Western <br />Westerly Alignment Easterly <br />Alignment Route (~ Alignment <br />$186,200 $299,990 $70,980 <br />$125,300 $125,300 $64,408 <br />$869,022 $1,400,100 $331,274 <br />$600,000 $600,000 $900,000 <br />$1,176,150 $1,176,150 $797,250 <br />$131,400 $74,000 $260,000 <br />$15.000 $0 $80,000 <br />$3,103,072 $3,675,540 $2,503,912 <br /> <br />The right of way acq.Uisition portion of either project quite likely wilI be a municipal <br />estimated above at upito $500,000. The City should consider the source of these funds <br />future capital improve~aents programming process. <br /> <br />expense <br />within a <br /> <br /> <br />