Storm Sewer <br />The project area is presently served by a storm sewer located at the intersection of <br />Xkimo Street NW anq 143rd Avenue NW. It is proposed that an 18 inch storm sewer <br />be extended to serve {the intersection of 143rd Lane NW and Xkimo Street NW. An <br />additional inlet for storm water will be placed between 143rd Lane and 143rd Avenue <br />NW. The proposed itorm sewer improvements are shown on Exhibit B. <br />Street Improvements <br />Xkimo Court NW and 143rd Lane NW are proposed to be constructed as standard <br />seven ton design residential streets, 30 feet in width having surmountable concrete <br />curb and gutter andl bituminous pavement. The bituminous pavement shall be a <br />minimum of two inures thick with four inches of Class V base. Xkimo Street NW <br />lying north of 143rd !Avenue NW shall consist of a 42 foot wide street with B -6/12 <br />curb along both sidos of the street. The pavement shall be constructed with four <br />inches of bituminous end four inches of Class V base sufficient to maintain a nine -ton <br />road design standard. Due to the proposed commercial development on west side of <br />Xkimo. Street, a fivefoot wide concrete sidewalk be placed along the -west side of <br />Xkimo Street NW. Aimo Street NW will be improved to the T.H. 47 right of way. <br />A total of four street I�Ights will be placed along Xkimo Street NW and the cul -de -sacs. <br />Following completion Hof the aforementioned street improvements, the boulevard areas <br />behind the curb will b covered with a minimum of four inches of black dirt, seeded, <br />fertilized and mulched to establish turf. The proposed street and sidewalk <br />improvements are shown on Exhibit B. <br />is <br />i <br />f <br />A detailed estimate of construction costs are presented in Appendix A. In addition <br />to the construction *ts, overhead costs include engineering, construction staking <br />and inspection, legal, bdministration, interest during construction and contingencies. <br />The overhead costs for the project are estimated based upon percentages of <br />construction cost. Those percentages are estimated to be as follows: <br />Engineering 9% <br />Staking nd Inspection 7% <br />Bonding rand Legal 3% <br />City Staif Administration 5% <br />Conting f ncies 4% <br />Interest Puring construction 2% <br />Table 1 contains a surkmary of total project costs which have been divided between <br />construction and o�erhead costs and also categorized between direct costs <br />2 <br />K5 <br />