Laserfiche WebLink
I <br />18. All costs incurred by the City in executing and administering this permit shall be the <br />responsibilit} of the permit holder. The permit holder shall maintain a minimum Five <br />Hundred Dol ar ($500.00) balance in an escrow account with the City. This escrow shall <br />be used to rei nburse the City for expenses incurred in the administration of this permit. At <br />' the time the nuning operation and site restoration are completed to the satisfaction of the <br />City, the bal ce of the escrow shall be returned to the Per nit Holder. <br />' 19. The haul rout for the excavated material shall be from the site westward for a distance of <br />approximatell 800 feet, and from there across outlot and golf course to the northern <br />boundary of a Burlington Northern right of way and then onto 153rd Avenue N.W., and <br />then southw4d to U.S. #10. It may also_be permissible to place the material on the outlot <br />' in accordance with an approved grading plan. <br />20. All grading operations shall be conducted between 6:30 a.m. and 8 p.m. on weekdays only <br />' unless otherwise specifically approved by the City Administrator and/or his designee. <br />21. The amount §f dust or other particulate matter caused by the mining operation shall not <br />' exceed the standards dards established by the Minnesota Pollution Control Agency. No operation <br />shall be allowed when wind gust exceed 30 miles per hour. <br />22. All operations shall comply with all applicable Minnesota Pollution Control Agency <br />' regulations and Federal and Environmental Protection Agency regulations for the protection <br />of water quality. <br />23. All haul roadi are subject to the approval of the City Engineer. While hauling operations <br />' are in progres , the permit holder shall maintain the haul road in a condition satisfactory to <br />the City Engineer. When hauling operations are completed, the permit holder shall either <br />restore that hhul road to a condition at least equal to that which existed at the time the <br />' hauling operations were started, or compensate the local road authority in an amount <br />satisfactory td that road authority and concurred in by the City Engineer for the restoration <br />of that haul read. The City Engineer will then accept such restoration or concur in such <br />' financial settl ment for the restoration of the haul road in writing and such acceptance will <br />relieve the pe 't holder of any additional obligation in connection with the restoration of <br />the haul road . If the permit holder fails or refuses to perform haul road restoration or to <br />make satisfactory financial settlement for such restoration, the City will cause the <br />restoration w rk to be done and require reimbursement from the financial guarantee <br />required here. <br />23. <br />The motion for ado�tion of the foregoing resolution was duly seconded by Councilmember <br />' and upon vote being taken thereon, the following voted in favor thereof: <br />and the following vot(id against the same <br />' and the following abstained <br />and the following werr, absent <br />whereupon said resolution was declared duly passed and adopted by the Ramsey City Council this <br />' the _ day of 1995. <br />� X19 <br />