Laserfiche WebLink
REQUEST FOR PROPOSAL , <br />T.H. #47 Access and Corridor Study <br />The City f Ramsey s seeking onsultant services for the development of an access and corridor <br />study for Trunk Highway #47. 4 The cosultant selected for this project would provide assistance in <br />traffic engineering and in the development of a transportation plan for the management of access , <br />and highway improvements on this segment of highway. If interested in this project, please <br />document your response in the form of a technical proposal. Outlined below is the project Request <br />for Proposal. This request for proposal does not obligate the City of Ramsey to complete the ' <br />project, and it reserves the right to cancel the solicitation if it is considered to be in its best interest. <br />A. Scope of Project: ' <br />This project will require the consultant to study and develop a transportation plan <br />that will be used by MnDOT Metro Division, Anoka County, and the City of <br />' <br />Ramsey in the decision making and planning of the operation and development on <br />the segment of Trunk Highway #47 for a 3.5 mile segment between C.R. #116 and <br />167th Avenue N.W.. The project scope will include a study of the existing <br />conditions relating to planning, review of existing and likely land uses along the <br />' <br />study segment, development of guidelines and recommendations for managing <br />access along the corridor, and identifying design improvements for intersections <br />and roadway segments. Environmental impacts and consultants will also be <br />t <br />identified. The final report will summarize the study findings, prepare cost <br />estimates, make recommendations for policies and implementation. The report will <br />be distributed to MnDOT, Anoka County and Met Council for comment prior to <br />finalization. <br />B . Goals and Objectives: <br />The goal of this project is to provide a final report that will include the data gathered, <br />documentation on the development of the alternatives and their analysis, and any <br />other materials, information and conclusions found in the work plan summarized <br />above in the project scope. <br />C.' Proiect Responsibilities and Tasks: <br />The major tasks to be accomplished include, but are not limited to the following: <br />Data Collection <br />• Identify functional classification and current level of service <br />• Identify speed limits and compare with actual speed <br />• Prepare 5 -year accident history <br />• Identify location of private accesses, <br />• Identify substandard sections with regard to sight distance, and highway <br />geometries <br />Study Analysis and Recommendations <br />• Identify problem area <br />• Identify intersection for signalization and address progressive timing <br />