My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/08/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 08/08/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:46:20 PM
Creation date
9/26/2003 1:20:22 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/08/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.1 <br /> <br />18. <br /> <br />Ali grading shall be completed within thirty (30) calendar days of the commencement of <br />the grading operation. <br /> <br />Ail costs incurred by the City in executing and administering this permit shall be the <br />responsibility of the permit holder. The permit holder shall maintain a minimum Five <br />Hundred Dollar ($500.00) balance in an escrow account with the City. This escrow shall <br />be used to reimburse the City for expenses incurred in the administration of this permit. At <br />the time the mining operation and site restoration are completed to the satisfaction of the <br />City, the balance of the escrow shall be returned to the Permit Holder. <br /> <br />All grading operations shall be conducted between 7:00 a.m. and 8 p.m. on weekdays only <br />unless otherwise specifically approved by the City Administrator and/or his designee. <br /> <br />The amount of dust or other particulate matter caused by the mining operation shall not <br />exceed the standards established by the Minnesota Pollution Control Agency. No operation <br />shall be allowed when wind gust exceed 30 miles per hour. <br /> <br />20.~ <br /> <br />Ail operations shall comply with all applicable Minnesota Pollution Control Agency <br />regulations and Federal and Environmental Protection Agency regulations for the protection <br />of water quality. <br /> <br />All haul roads are subject to the approval of the City Engineer. While hauling operations <br />are in progress, the permit holder shall maintain the haul road in a condition satisfactory to <br />the City Engineer. When hauling operations are completed, the permit holder shall either <br />restore that haul road to a condition at least equal to that which existed at the time the <br />hauling operations were started, or compensate the local road authority in an amount <br />satisfactory to that road authority and concurred in by the City Engineer for the restoration <br />of that haul road. The City Engineer will then accept such restoration or concur in such <br />financial settlement for the. restoration of the haul road in writing and such acceptance will <br />relieve the permit holder of any additional obligation in connection with the restoration of <br />the haul roads. If the permit holder fails or refuses to perform haul road restoration or to <br />make satisfactory financial settlement for such restoration, the City will cause the <br />restoration work to be done and require reimbursement from the financial guarantee <br />required herein. <br /> <br />The motion for adoption of the foregoing resolution was duly seconded by Councilmember <br /> and upon vote being taken thereon, the following voted in favor thereof: <br /> <br />and the following voted against the same <br />and the following abstained <br /> <br />and the following were absent <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.