My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/26/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 09/26/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:47:57 PM
Creation date
9/26/2003 2:07:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/26/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> <br />DATE: <br /> <br />TO: <br /> <br />FROM: <br /> <br />RE: <br /> <br />S0ptember 29, 1995 <br /> £ <br />R~an, Schroeder, City Administrator dr~ <br />Ji09 Gromberg, Economic Development Coordinat. <br />SeWer Hook-Up Requirements <br /> <br />As you requestocl, I have contacted the Metropolitan Council concerning the connection <br />requirements forI residents having sanitary sewer available to their homes. Based upon the <br />information that Was provided by Jim Larsen (see attachments), "Within 24 months after a pubIic <br />sewer connected ito the Metropolitan Disposal System (MDS) becomes available to a property <br />served by a private sewage disposal system or treatment works, a connection shall be made to the <br />public sewer in a~ordance with these rules". The Metropolitan Council requires all municipalities <br />to adopt these rules, prior to any MUSA expansion. <br /> <br />I have also contacted the City of Elk River, and they have a similar policy that requires hook-up <br />within two yearslfor residential properties and 90 days for commercial properties. The City <br />Council for Elk ~ver will review the possibility of granting an additional extension on a case by <br />case basis. · <br /> <br />With this information, the City of Ramsey should probably not change its current policy of <br />requiring connecOon within two years. If the City would choose to change the policy and allow a <br />longer window, itimay jeopardize future MUSA expansion requests. This would not preclude the <br />City from developing a quantifiable deferment system based upon investments in private systems. <br />If you would like ~tdditional information, or have any questions, please see me. <br /> <br />/CCT <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.