Laserfiche WebLink
'1 <br /> I <br /> I <br /> I <br /> I <br /> ! <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> ! <br /> I <br />! <br /> <br />street and ufil~.~_ improvement terminate just beyond the radius points of the intersection. <br />Additionally, _~taff feels it would be beneficial to extend street and utility improvements <br />eastward for a~listance to allow the parcel east of the EDM Inc. lot to be readily marketable. <br />We recommenkt that the street extension be designed and constructed for a minimum of <br />1,000 feet. Iff our discussion with EDM Inc., we have agreed to a goal of having the <br />McKinley Sm~et extension in place by July 1, 1996. This extension would have an <br />approximate_ ~tal project cost, including consu'ucfion and project overhead, of <br />approximatelyl $100,000. <br /> <br />In selecting a ~nsultant for this work, I would recommend that we obtain proposals from <br />several consultants and award on the basis of price and experience. I would propose the <br />City send RFP.'s to: <br /> <br />1. HakansontAnderson - This is a locally based firm from Anoka which did the <br /> engineering on Business Park 95 of which this project will be an extension. <br /> <br />2. John Oliveir Inc. - This is a locally based fn-rn from Elk River having a background in <br /> general ci~l work such as this project. <br /> <br />3. MSA Inc. i- this fu'm has expressed interest in performing work in Ramsey and is <br /> currently ~fforming work in neighboring Elk River. <br /> <br />Recommendation: <br /> <br />I would recommend the following regarding the selection of consultants for the above 1996 <br />construction p/gjects: <br /> <br />Wetlan~l~ #114P Mitigation for filling associated with Sunwood Drive - Negotiate a <br />changelof scope contract with John Oliver & Associates Inc. <br />Extens$on of Sunwood Drive from C.R. #56 to C.R. #116 and sanitary sewer and <br />waterr~n extension to AEC Energy Park - Accept Hakanson Anderson proposal in <br />the n~t-to-exceed amount of $24,800 for basic engineering services and <br />constrficfion, staking and inspection on an hourly basis estimated at $28,500. <br /> <br />Well .l~o. 3 - Solicit proposal for not-to-exceed costs from the following <br />engine~'ing consultants: (1) Bonestroo, Rosene, Andefllk and Associates (2) <br />ProgreSsive Consulting Engineers Inc. (3) Hakanson Anderson Inc. (4) John <br />OliverIne.; and (5) OSMInc. <br /> <br />McKinley Street and Utility Extension - Solicit proposals for not-to-exceed costs <br />from Ge following engineering consultants: (1) Hakanson Anderson (2) John <br />Oliverlnc.; and (3) MSA Inc. <br /> <br />Commission: Action: <br /> <br />Based upon diicussion. <br />Reviewed bY: <br />City Engineer: <br />City Administrator <br />Finance Office~ <br />R&B: 12/12/~95 <br /> <br />]jmt <br /> <br /> <br />