Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> i <br /> I <br /> I <br /> <br /> I <br /> I <br />i <br />I <br />I <br />I <br />i <br />I <br /> <br />Mr. Steve Jank6wski, City Engineer <br />Page 2 <br />November 21, 17,995 <br /> <br />Prapare necessary submittal information to the Minnesota Pollution <br />Col~trol Agency and the Department of Health. <br />Prepare final cost estimate. <br />Sol!cit and obtain bids. <br />Cogfer with City and representatives of Anoka Electric Cooperative to <br />finalize routing, easements and services requirements. <br />Provide project observation by registered professional engineer. <br /> r <br />Reyiew shop drawings, change orders, prepare and certify payment <br />requests. <br /> <br />Estimated "not t;o exceed" cost of basic services: <br /> <br />$24,800 <br /> <br />II. Technical <br /> <br />· Pro <br />· Pre <br /> <br />Estimated <br />Hakanson <br /> <br />All of the above <br /> <br />Services <br /> <br />fide construction staking and inspection. <br />aaration of as-built plans. <br /> <br />cost of technical services provided by <br />Anderson Associates: <br /> <br />$28,500 <br /> <br />rests are based on our current hourly rates and the estimated cost of <br /> <br /> [ <br />the basic engin~ering services is a not to exceed cost. The cost of the technical <br />services is an estimated cost and will depend on the contractor and the weather <br />conditions during construction. The above costs did not include permit fees or <br />materials testings. <br /> <br />Following is a pr~oposed schedule based on a start date of December 4, 1995. <br /> <br />Task <br /> <br />Completion Date <br /> <br />Prepare plans an~ specifications and submit to <br />reviewing agenc!es for permits and Mn/Dot approval <br />Set the bid date; <br />Award bids <br />Compete constr(~ction <br /> <br />February 16, 1996 <br /> <br />February 27, 1996 <br />March 26, 1996 <br />July 1, 1996 <br /> <br /> <br />