My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 12/12/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:49:55 PM
Creation date
9/26/2003 3:28:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br /> <br /> I <br /> I <br /> i <br /> I <br /> I <br /> <br /> I <br /> I <br />i <br />I <br />I <br />I <br />i <br />I <br /> <br />Mr. Steve Jank6wski, City Engineer <br />Page 2 <br />November 21, 17,995 <br /> <br />Prapare necessary submittal information to the Minnesota Pollution <br />Col~trol Agency and the Department of Health. <br />Prepare final cost estimate. <br />Sol!cit and obtain bids. <br />Cogfer with City and representatives of Anoka Electric Cooperative to <br />finalize routing, easements and services requirements. <br />Provide project observation by registered professional engineer. <br /> r <br />Reyiew shop drawings, change orders, prepare and certify payment <br />requests. <br /> <br />Estimated "not t;o exceed" cost of basic services: <br /> <br />$24,800 <br /> <br />II. Technical <br /> <br />· Pro <br />· Pre <br /> <br />Estimated <br />Hakanson <br /> <br />All of the above <br /> <br />Services <br /> <br />fide construction staking and inspection. <br />aaration of as-built plans. <br /> <br />cost of technical services provided by <br />Anderson Associates: <br /> <br />$28,500 <br /> <br />rests are based on our current hourly rates and the estimated cost of <br /> <br /> [ <br />the basic engin~ering services is a not to exceed cost. The cost of the technical <br />services is an estimated cost and will depend on the contractor and the weather <br />conditions during construction. The above costs did not include permit fees or <br />materials testings. <br /> <br />Following is a pr~oposed schedule based on a start date of December 4, 1995. <br /> <br />Task <br /> <br />Completion Date <br /> <br />Prepare plans an~ specifications and submit to <br />reviewing agenc!es for permits and Mn/Dot approval <br />Set the bid date; <br />Award bids <br />Compete constr(~ction <br /> <br />February 16, 1996 <br /> <br />February 27, 1996 <br />March 26, 1996 <br />July 1, 1996 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.