My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/07/1995
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1995
>
Agenda - Planning Commission - 03/07/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:13:12 PM
Creation date
9/29/2003 11:20:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/07/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental protection <br /> <br />§ 9.21 <br /> <br />Classification of ¶2 & ¶3 above must provide all of the information <br />requested in the preceding §9.21.05 subd. 4b. <br /> <br />Classification of ¶ 1 above shall provide a certificate of survey to the <br />Building Inspector at the time the building permit is applied for. The <br />Building Inspector shall review the lot for which the building permit is <br />requested by reviewing that data submitted for the environmental permit <br />for the plat in which the lot is located. This review shall be made in <br />order to insure that the "Permit Standards" adopted herein are complied <br />with and that the construction of such a single family home will be <br />consistent with said "Permit Standards". <br /> <br />Subd. <br /> <br /> a. <br /> <br />bo <br /> <br />5. Expiration, Extension and Revisions. <br /> <br />A permittee shall begin the work authorized by the permit within 60 <br />days from the date of issuance of the permit unless a different date for <br />the commencement of work is set forth in the permit. The permittee <br />shall complete the work authorized by the permit within the time limit <br />specified in the permit which in no event shall exceed more than 12 <br />months from the date of issuance. The permittee shall notify the Zoning <br />Administrator at least 24 hours prior to the commencement of work. <br /> <br />Should the work not be commenced as specified herein, then the permit <br />shall become void. However, if prior to the date established for <br />commencement of work the permittee makes written request to the <br />Zoning Administrator for an extension of time to commence the work, <br />setting forth the reasons for the required extension of not greater than <br />one single year, then the permit shall remain in force. <br /> <br />Any revision of the originally approved site plan must be approved by <br />the Council after findings by the Planning Commission and Zoning <br />Administrator. <br /> <br />do <br /> <br />A permit may be approved subject to compliance with conditions which <br />are specifically set forth in the permit and are necessary to insure <br />compliance with the requirements contained in this section. Such <br />conditions may, among other matters, limit the size, kind or character of <br />the proposed development, require the construction of other structures <br />including special foundations and soil stabilization structures, establish <br />required monitoring procedures, require such alterations of the site as <br />may be necessary, require execution of an agreement between the City <br />and the developer, require a surety in the form of a performance bond, <br />cash escrow or letter of credit in an amount of 150% of the.expected <br />development costs as determined by the City Engineer. Accompanying <br />such agreement shall be a statement from the owner indicating the City's <br />right of entry to the property if it becomes necessary to complete the <br />agreed upon work. <br /> <br /> Subd. 6. Fees. A schedule of fees for the examination and approval of site <br />plans leading to an environmental permit and the inspection of all required improvements and <br />conditions in such plans shall be determined by resolution of the Council which may from time to <br />time change such schedule. Prior to approval of any site plan, such fees shall be paid to the <br />Zoning Administrator and be deposited to the credit of the general fund. <br /> <br /> Subd. 7. Effect of Permit. The granting of an environmental permit under <br />the provisions of this section shall in no way affect the owners or the permittee's responsibility to <br />obtain the approval required by any other statute, ordinance or regulation of any Federal or State <br />agency or subdivision thereof. <br /> <br />9.21.06 DNR permits. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.