Laserfiche WebLink
The product of this task will be a traffic report that identifies the appropriate lane configuration for the <br />intersection of Sunwood Boulevard /Ramsey Parkway and Armstrong Boulevard and the appropriate <br />spacing with the next intersection to the east in order to maintain an acceptable level of service. The <br />report will also evaluate the warrants for a traffic signal at the Sunwood Boulevard /Ramsey Parkway and <br />Armstrong Boulevard Intersection. WSB will submit the report to Anoka County for their review and <br />comment and incorporate changes as appropriate. <br />2.0 Prepare Feasibility Study for Intersection Improvements <br />The feasibility study would develop a concept design and cost to construct an intersection at <br />Sunwood /Ramsey Parkway and Armstrong Boulevard that fits with both the future preferred interchange <br />design for Armstrong Boulevard and TH 10 and the existing roadway system. The feasibility study will <br />evaluate the storm water needs, utility relocation or reconstruction needs, number and configuration of <br />lanes, horizontal and vertical alignments, right -of -way needs, construction costs, and funding. A layout <br />for review by Anoka County would be prepared as part of the feasibility study. We anticipate one meeting <br />with Anoka County staff to review the assumptions and design. We will submit a layout to the County for <br />review and comment and will make changes as appropriate to address their comments. We will utilize <br />existing survey and topographic data for the feasibility study. We do not propose to conduct additional <br />survey at this point. We will also utilize the existing geotechnical data for the corridor for determining the <br />roadway pavement section and earthwork needs for the project. We anticipate that there may be some <br />retaining wall needs for the project. <br />Final Design and Construction Plans <br />3.0 Prepare SJR <br />Mr. Tim Himmer, PE <br />July 20, 2011 <br />Page 2 <br />This work assumes that the limits for the final design and construction plans for Armstrong Boulevard are from <br />approximately 500 feet north of 147 to just north of the BNSF railroad crossing. It is assumed that the project <br />will not involve work in the railroad right -of -way. It is assumed that some retaining wall will be required along <br />Armstrong Boulevard south of 147 and that some relocation of existing utilities will be required to accommodate <br />the retaining walls. It is assumed that the project will include the preparation of signal plans. <br />WSB will prepare a signal justification report for the intersection of Sunwood Boulevard /Ramsey Parkway <br />and Armstrong Boulevard that will take into account the existing traffic plus the traffic from any approved <br />development in the area. <br />4.0 Prepare Right - of -way Plans and Parcel Descriptions <br />WSB will prepare the right -of -way plans and parcel descriptions necessary to acquire the strip takings <br />along Armstrong Boulevard needed for the project. <br />5.0 Assist in Right -of -Way Acquisition <br />WSB will obtain appraisals for the strip takings and <br />6.0 Complete Final Design and Prepare Construction Plans <br />WSB will complete the final design and construction plans for the intersection of Sunwood <br />Boulevard /Ramsey Parkway and Armstrong Boulevard. The plans will include the areas adjacent to <br />Armstrong Boulevard and will be coordinated with the design for the proposed development and the <br />Sunwood /Ramsey Parkway improvements being developed by others. <br />