My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/26/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 07/26/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:14:28 PM
Creation date
7/21/2011 5:19:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/26/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tim Himmer, PE <br />July 20, 2011 <br />Page 3 <br />A general overview of the tasks is outlined below. <br />• Title Sheet with current information and project limits. <br />• Prepare Alignment Plan and Tabulation sheets for Armstrong Boulevard and Sunwood /Ramsey <br />• Prepare quantity tabulations, earthwork tabulations, typical sections, alignment, profile, cross - <br />section sheets and develop additional sheets. Bunker Lake Boulevard Extension and Puma <br />Street widening. <br />• Prepare Staging and Traffic Control Sheets <br />• Prepare in place Topography and Removals and add sheets for Bunker Lake Boulevard <br />Extension and Puma Street widening. <br />• Prepare sanitary sewer relocation /reconstruction plans <br />• Update Armstrong Boulevard drainage plans. Prepare storm drainage layout and sizing. <br />Conduct spread run -by analysis and determine catch basin locations. Prepare final storm <br />drainage plans and tabulations. <br />• Develop a Storm Water Pollution Prevention Plan (SWPPP) for the project including temporary <br />and permanent erosion control measures and storm water management systems. <br />• Prepare signing and striping plans including tabulations and details <br />• Prepare final signal plans including accommodations for EVP system. <br />• Prepare Intersection Details <br />• Prepare Bidding Schedule and Estimated Quantities, Cost <br />7.0 Prepare Project Manual <br />This will include the technical specifications, the Instructions to Bidders, and the Contract conditions. <br />8.0 Prepare Permit Applications <br />The permit applications will include the following permits <br />• Minnesota Pollution Control Agency (MPCA) NPDES Storm Water Permit <br />• Minnesota Pollution Control Agency (MPCA) Sanitary Sewer Extension Permit <br />• Minnesota Department of Health (MDH) Permits for watermain extension and dewatering. <br />• Anoka County Work in ROW Permit. <br />• Lower Rum River Watershed Management Organization Permit. <br />9.0 Bidding Administration <br />Bidding Administration will include the following: <br />• Prepare Advertisement <br />• Distribute Bidding Documents <br />• Answer Questions <br />• Prepare, issue and distribute addenda <br />
The URL can be used to link to this page
Your browser does not support the video tag.