SCHEDULE <br />Task Date <br />Complete Traffic and Feasibility Study September 15, 2011 <br />Complete SJR November 30, 2011 <br />Complete Right -of -Way Plans November 30, 2011 <br />Construction Plans for County & State Aid Review January 5, 2012 <br />Advertise February 28, 2012 <br />Bid Opening March 30, 2012 <br />Right -of -way Acquired March 30, 2012 <br />Construction Start May 1, 2012 <br />• Attend bid opening <br />Mr. Tim Himmer, PE <br />July 20, 2011 <br />Page 4 <br />The City of Ramsey desires to have these improvements constructed in 2012. In order to provide as much time <br />as possible for construction, the bid opening is proposed for March of 2012. The table below provides an overall <br />general milestone schedule for the project assuming the authorization to proceed on the Traffic Study and <br />Feasibility Study is authorized by August 1, 2011. <br />COST ESTIMATE <br />WSB estimates the cost for the traffic and feasibility study phase at $35,290. See the attached table. The final <br />design and construction plan phase is estimated at. WSB will only bill the City for the actual hours spent at our <br />standard billing rates up to the maximum estimated amount. <br />Sincerely, <br />WSB & Associates, Inc. <br />Anthony Heppelmann, PE <br />Vice President <br />