My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 11/09/1995
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1995
>
Agenda - Planning Commission - 11/09/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:28:47 PM
Creation date
10/1/2003 9:06:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
11/09/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 <br /> <br />9.23.11 <br /> <br />Subd. 3. Utility Transmission Lines and Essential Services. All utility <br />transmission crossings of land and essential services within the Scenic River <br />Land Use District designated by this section shall require a conditional use <br />permit. The construction of such transmission services and essential <br />services shall be subject to the standards and criteria listed in of MN Rules, <br />part 6105.0180. No conditional use permit shall be required for high <br />voltage transmission lines under control of the Environmental Quality <br />Council pursuant to Minnesota Statutes SS 116 C 61. <br /> <br />Subd. 7.b.5. With the omission of e., change f. to e. (I think these were <br />also supposed to be parentheses [e.g. (e)] in your new scheme.) <br /> <br />Thank you very much for making the other changes listed in previous letters. I will be happy <br />to review as many other drafts pertaining to the Rum and Mississippi Rivers ,a_s you would <br />like. There is no pending deadline for amendments for these rivers from DNR s standpoint. <br />It is much more critical that the amendments be written to reflect the minimum standards <br />required by law. <br /> <br />I apologize for the short turn-around, but there were many other deadlines ahead of you. <br />Please let me know ff you have any furtherquestions about the comments, rules or <br />ordinance adoption process [297-2401; fax 296-0445]. <br /> <br />Sincerely, <br /> <br />Sandy Fecht// <br />Wild-& Scer~ Rivers Coordinator <br /> <br />cc: Tom Hovey <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.